Influence of Different Excavation Sequence of Double-Side Heading Method on Supporting Structure

被引:1
|
作者
Ling, Chengkun [1 ]
Ruan, Yanmei [2 ]
Wu, Pengbo [1 ]
Li, Jin [1 ]
Zhao, Jin [3 ]
Yuan, Bingxiang [3 ]
机构
[1] China Railway Tenth Bur Grp, Urban Rail Transit Engn Co Ltd, Guangzhou 510000, Guangdong, Peoples R China
[2] Guangzhou Metro Design & Res Inst Co Ltd, Guangzhou 510030, Guangdong, Peoples R China
[3] Guangdong Univ Technol, Sch Civil & Transportat Engn, Guangzhou 510006, Guangdong, Peoples R China
基金
中国国家自然科学基金;
关键词
PERFORMANCE;
D O I
10.1155/2022/2258594
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The double-side heading method is often used in the construction of large-span and large-section tunnels. The excavation of the pilot tunnel is complex, so the construction efficiency is low. Based on the underground excavation tunnel project of a subway in Guangzhou, the section excavation sequence of the traditional double-side heading method is optimized according to the actual situation. Midas/GTS software is used for finite element analysis, the displacement and internal force of ground settlement and support structure under two different section excavation sequences are calculated, and the calculation results are compared with the field monitoring data. The calculation results show that the influence of the two excavation sequences on the displacement of the supporting structure is not much different, but the influence on the internal force of the supporting structure is obviously different. The stress value of the supporting structure caused by the optimized excavation sequence is larger, especially the temporary inverted arch, but it is within the controllable range. The optimized excavation sequence increases the construction work surface, greatly improves the construction efficiency, and reduces the project cost, which can provide a reference for the construction of urban subway tunnels under similar engineering conditions in the future.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] Study on Optimization of Core Pillar in Large-span Tunnel Excavated with Double-side Heading Method
    Wang, Cheng
    Su, Zhongming
    ADVANCES IN BUILDING MATERIALS, PTS 1-3, 2011, 261-263 : 1882 - +
  • [2] High isolation Superconducting Diplexer Designed With Double-side Structure
    Wang, Xiang
    Wei, Bei
    Cao, Bisong
    Guo, Xubo
    2018 IEEE/MTT-S INTERNATIONAL MICROWAVE SYMPOSIUM - IMS, 2018, : 1076 - 1078
  • [3] A method to discriminate between upper and lower side material removal in double-side polishing
    Maunier, C.
    Redien, M.
    Fernandes, B. Da Costa
    Neauport, J.
    OPTIFAB 2019, 2019, 11175
  • [4] Synchronously running control method for four machines of double-side shear
    Pei, Ruilin
    Miao, Jianxin
    Fang, Ying
    Diao, Zongjie
    Wang, Yue
    Wang, Zhaoan
    2006 1ST IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS, VOLS 1-3, 2006, : 826 - +
  • [5] Synchronously running control method for four machines of double-side shear
    Pei, Ruilin
    Miao, Jianxin
    Fang, Ying
    Diao, Zongjie
    Wang, Yue
    Wang, Zhaoan
    ICIEA 2006: 1ST IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS, VOLS 1-3, PROCEEDINGS, 2006, : 990 - 992
  • [6] Numerical Stability Analysis of Large Section Tunnels Using the Double-Side Heading Method: A Case Study of Xiamen Haicang Evacuate-Channel
    Wang, Jianxiu
    Cao, Ansheng
    Wu, Zhao
    Lin, Lihua
    Li, Zonghai
    Liu, Xiaotian
    Li, Huboqiang
    Long, Yanxia
    Sun, Yuanwei
    APPLIED SCIENCES-BASEL, 2023, 13 (01):
  • [7] Analysis of Coupling Effect of Double-side Linear Induction Motor with Shielding Structure
    Zhang, Yuxing
    Lin, Chengmei
    Xu, Jin
    Sun, Zhaolong
    2014 17TH INTERNATIONAL CONFERENCE ON ELECTRICAL MACHINES AND SYSTEMS (ICEMS), 2014, : 3638 - 3641
  • [8] A Novel Method of Constructing an Electroosmotic Micromixer with Double-Side Electrodes for Biotechnological Applications
    Talebzadeh, Nima
    Sis, Farshid Taleb
    Zargari, Siavash
    Veladi, Hadi
    SENSORS AND MATERIALS, 2015, 27 (07) : 525 - 538
  • [9] Theory and experimental research on spiral bevel gear by double-side milling method
    Geng, Longlong
    Deng, Xiaozhong
    Zhang, Hua
    Nie, Shaowu
    Jiang, Chuang
    MECHANICS & INDUSTRY, 2021, 22 (22)
  • [10] Double-side Direct Contact Calibration Thru Kit With Non-exchanging Structure
    Chou, Wen
    Chen, Bo-You
    Wu, Sung-Mao
    Chen, Cheng-Chang
    Lin, Ming-Shan
    PROCEEDINGS OF THE 2016 IEEE 18TH ELECTRONICS PACKAGING TECHNOLOGY CONFERENCE (EPTC), 2016, : 47 - 50