Variations in area- and time-specific marginal capacity costs of electricity distribution

被引:17
|
作者
Heffner, G
Woo, CK
Horii, B
Lloyd-Zannetti, D
机构
[1] Elect Power Res Inst, Customer Syst Div, Washington, DC 20036 USA
[2] Energy & Environm Econ Inc, San Francisco, CA 94111 USA
关键词
D O I
10.1109/59.667383
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Marginal costs of electricity vary bg time and location. Past researchers attributed these variations to factors related to electricity generation and transmission, Those authors, however, did not fully analyze the large variations in marginal distribution capacity costs (MDCC) by area and time. Thus, the objectives of this paper are: (1) to propose: a method to estimate MDCC; (2) to demonstrate the significant intra- and inter-utility variations in MDCC; and (3) to discuss the usefulness of these cost estimations in integrated resource planning.
引用
收藏
页码:560 / 566
页数:7
相关论文
共 31 条