Root Causes of Recurring Contractual Conflicts in International Construction Projects: Five Case Studies from Vietnam

被引:48
|
作者
Maemura, Yu [1 ]
Kim, Eugene [2 ]
Ozawa, Kazumasa [1 ]
机构
[1] Univ Tokyo, Dept Civil Engn, Construct Management & Infrastruct Syst, Bunkyo Ku, 7-3-1 Hongo, Tokyo 1138656, Japan
[2] Seoul Natl Univ, Canc Res Inst, BIOINFRA Inc, Strateg Planning, 8F,101 Daehak Ro, Seoul 03080, South Korea
关键词
POLITICAL RISKS; MANAGEMENT; DELAY;
D O I
10.1061/(ASCE)CO.1943-7862.0001523
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
While many studies have identified contractual conflicts as a major cause of construction delays in international construction projects, their underlying causes have been rarely explored. The current study attempts to contribute to knowledge that could help minimize international construction project delays through an examination of contractual conflicts. Through qualitative analyses of interviews with 33 practitioners involved in large-scale international construction projects in Vietnam, this study has extracted 19 causal factors of recurring contractual conflicts falling under six categories. The causal factors have been adapted into a causality diagram that serve as a tool for mapping the sequential development and investigating the root causes of contractual conflicts in international construction project cases. The causality diagram is applied to five case studies in Vietnam, a country of which relatively few case studies on the construction sector can be found in the literature. Two case studies clarify how causality chains that develop into contractual conflicts are initiated by the following root causes: (1)low levels of political support; (2)low levels of international project management experience by the owner; (3)low utilization of relational-approaches; and (4)inadequate contract clarifications performed during the precontract period. Three project cases that have avoided contractual conflicts are then presented, along with descriptions of how one or more of the root causes were addressed in each project.
引用
收藏
页数:15
相关论文
共 21 条
  • [1] Time overruns in the construction projects in Iraq: Case study on investigating and analyzing the root causes
    Al Kulabi, Ahmed Kamil
    Atiea, Huda M. Jawad
    OPEN ENGINEERING, 2022, 12 (01): : 702 - 715
  • [2] Large construction projects in developing countries: A case study from Vietnam
    Long, Nguyen Duy
    Ogunlana, Stephen
    Quang, Truong
    Lam, Ka Chi
    International Journal of Project Management, 2004, 22 (07) : 553 - 561
  • [3] Contractual Governance for Dispute Resolution and Construction Sustainability: Case Studies from China
    Tang, Bingsong
    Li, Nan
    SUSTAINABILITY, 2022, 14 (13)
  • [4] Mitigation of contractual breaches in international construction joint ventures under conditions of absent legal recourse: case studies from Iran
    Mirzaee, Ali Mohammad
    Hosseini, M. Reza
    Martek, Igor
    Rahnamayiezekavat, Payam
    Arashpour, Mehrdad
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (04) : 1481 - 1495
  • [5] Construction productivity prediction through Bayesian networks for building projects: case from Vietnam
    Khanh, Ha Duy
    Kim, Soo Yong
    Linh, Le Quoc
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (05) : 2075 - 2100
  • [6] Assessing the impact of the traits of payment delay causes on subcontractor's business performance in construction projects: a case study in Vietnam
    Nguyen, Viet Thanh
    Do, Sy Tien
    Tran, Cuong N. N.
    Vo, Mui Dinh
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (11) : 1259 - 1269
  • [7] Knowledge Transfer from International Consultants to Local Partners: An Empirical Study of Metro Construction Projects in Vietnam
    Son Ngoc Nguyen
    Islam, Nazrul
    INTERNATIONAL JOURNAL OF KNOWLEDGE MANAGEMENT, 2018, 14 (02) : 73 - 87
  • [8] Political Risk Paths in International Construction Projects: Case Study from Chinese Construction Enterprises
    Chang, Tengyuan
    Deng, Xiaopeng
    Hwang, Bon-Gang
    Zhao, Xiaojing
    ADVANCES IN CIVIL ENGINEERING, 2018, 2018
  • [9] Risk Paths in International Construction Projects: Case Study from Chinese Contractors
    Liu, Junying
    Zhao, Xianbo
    Yan, Peng
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (06)
  • [10] Lessons to be learned from concurrent engineering in the management of construction projects: case studies from the aerospace and construction industries
    Tookey, JE
    Betts, J
    ADVANCED MANUFACTURING PROCESSES, SYSTEMS, AND TECHNOLOGIES (AMPST 99), 1999, : 165 - 174