Visual and Virtual Production Management System for Proactive Project Controls

被引:25
|
作者
Lin, Jacob J. [1 ]
Golparvar-Fard, Mani [2 ]
机构
[1] Natl Taiwan Univ, Dept Civil Engn, 1 Sect 4,Roosevelt Rd, Taipei 10617, Taiwan
[2] Univ Illinois, Dept Civil & Environm Engn Comp Sci & Tech Entrep, 205 N Mathews Ave, Urbana, IL 61801 USA
基金
美国国家科学基金会;
关键词
PRODUCTION FLOW; CONSTRUCTION; PROGRESS; INTERIOR; BIM;
D O I
10.1061/(ASCE)CO.1943-7862.0002045
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Current construction still suffers from significant schedule delays and budget overruns due to inefficient and retroactive project controls programs. This paper developed a visual and virtual project control system that proactively promotes team-based planning and real-time communication of progress and schedule risk. The system benefits from the growth of visual data on construction sites and the increasing maturity level of building information modeling (BIM), to map the current state of production in 3D and expose waste. By modeling production trends, reliability in the future state of production is forecasted to highlight potential delay issues in a location-driven scheme. A visual 3D interface supports collaborative decision-making to eliminate root causes of waste, enables pull flows between people and information, decentralizes work tracking, and facilitates in-process quality control and hand-overs among contractors. This system was implemented on two projects to validate the underlying algorithms. Results show that the system's functional aspects improve transparency, accountability, and traceability in project execution, and streamline communications between the field and the office. Specifically, 30% PPC increase and four weeks project completion date advance have been observed. Limitations such as resistance to workflow changes could be further improved in the future through early system introduction. (C) 2021 American Society of Civil Engineers.
引用
收藏
页数:17
相关论文
共 50 条
  • [1] Visual Data and Predictive Analytics for Proactive Project Controls on Construction Sites
    Lin, Jacob J.
    Golparvar-Fard, Mani
    ADVANCED COMPUTING STRATEGIES FOR ENGINEERING, PT I, 2018, 10863 : 412 - 430
  • [2] Proactive Construction Project Controls via Predictive Visual Data Analytics
    Lin, Jacob J.
    Golparvar-Fard, Mani
    COMPUTING IN CIVIL ENGINEERING 2017: SENSING, SIMULATION, AND VISUALIZATION, 2017, : 147 - 154
  • [3] Proactive Project Management as a Discrete Event System
    Dombrowski, Michael
    Sachenko, Anatoliy
    Sachenko, Oleg
    Dombrowski, Zbyshek
    2020 IEEE EUROPEAN TECHNOLOGY AND ENGINEERING MANAGEMENT SUMMIT (E-TEMS 2020), 2020,
  • [4] Visual models' system of project management
    Kolychev, V.D., 1600, National Research Nuclear University (06):
  • [5] Project management in virtual prototype of complex system
    Zhu, Yao-Qin
    Wu, Hui-Zhong
    Yu, Yong-Jia
    Xitong Fangzhen Xuebao / Journal of System Simulation, 2005, 17 (05): : 1137 - 1140
  • [6] A generic decision support system for reactive and proactive production system management
    Aubry, R
    Legait, A
    Niel, E
    Schwarz, JJ
    COMPUTATIONAL INTELLIGENCE FOR MODELLING, CONTROL & AUTOMATION - INTELLIGENT IMAGE PROCESSING, DATA ANALYSIS & INFORMATION RETRIEVAL, 1999, 56 : 299 - 306
  • [7] Implications of Virtual Project Management on Project Management Processes
    Watfa, Mohamed
    Todd, Catherine
    2016 SIXTH INTERNATIONAL CONFERENCE ON INNOVATIVE COMPUTING TECHNOLOGY (INTECH), 2016, : 58 - 62
  • [8] Research and implementation of distributed project management system for virtual enterprise
    Yin, JW
    Li, YQ
    Zhou, ZX
    Dong, JX
    PROCEEDINGS OF THE NINTH INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN, VOLS 1 AND 2, 2005, : 175 - 180
  • [9] Building the process of the project management system of agile virtual enterprise
    Su, Lu
    Wang, Hui-Min
    Xu, Xiao-Fei
    Wang, Sai
    Harbin Gongye Daxue Xuebao/Journal of Harbin Institute of Technology, 2004, 36 (05): : 574 - 577
  • [10] An information management system for production planning in virtual enterprises
    Zhou, Q
    Souben, P
    Besant, CB
    COMPUTERS & INDUSTRIAL ENGINEERING, 1998, 35 (1-2) : 153 - 156