Risk based prioritization of maintenance repair work

被引:21
|
作者
Harnly, JA [1 ]
机构
[1] Exxon Chem Co, Baytown, TX 77520 USA
关键词
D O I
10.1002/prs.680170108
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
This paper describes the development of a risk ranked Inspection Recommendation procedure that is used by one of Exxon's chemical plants to prioritize repairs that have been identified during equipment inspection. As part of the Company's Safety Management Practices initiative in the late 1980's, a procedure was put into Place to ensure that an Inspector's repair recommendations were properly addressed by the organization. The initial procedures were successful at "systematizing" the documentation and stewardship-to-completion of the Inspector's recommendation, however, there were complications with the original process. 1) The inspector made a simple High, Medium or Low assessment of the priority/criticality of the recommendation. Frequently this resulted in disagreements with Operations about the true priority of the recommendation. 2) If there was agreement on the priority of the recommendation. there was still disagreement on the relative rank within the priority-which high priority was the highest priority? 3) With limited funds to spend on repairs, it was (and is) important to make sure that the money was being spent on the highest risk items that had the greatest risk reduction/cost benefit ratio. To address these concerns, the procedure was modified to incorporate a risk assessment of the recommendation by both the Inspector and Operations. In the new procedure, the Inspector describes the deficiency that he/she finds and assesses the probability of failure within a certain time-frame. Operations must assess the consequences, from an environmental, safety and economics standpoint, were the failure to occur, These assessment are combined in the typical risk equation (risk=probability x consequences) to arrive at a severity index which serves to rank the recommendation relative to the other recommendations. Because Operations participates in the assessment there is very little disagreement about the priority of the recommendation. The severity index puts the recommendations in order so it is quite clear which are the highest priority recommendations. This process has helped to focus the entire organization on those deficiencies that represent the greatest risk with the result that less time and money is spent correcting items that have a low risk/cost benefit fit ratio allowing these savings to be used to reduce the higher risks in the planet.
引用
收藏
页码:32 / 38
页数:7
相关论文
共 50 条
  • [1] Development of Risk-Based Bridge Maintenance Prioritization Methodology
    Kim, Dongjin
    Lee, Yongjun
    Lee, Min-jae
    KSCE JOURNAL OF CIVIL ENGINEERING, 2018, 22 (10) : 3718 - 3725
  • [2] Development of Risk-Based Bridge Maintenance Prioritization Methodology
    Dongjin Kim
    Yongjun Lee
    Min-jae Lee
    KSCE Journal of Civil Engineering, 2018, 22 : 3718 - 3725
  • [3] Maintenance and Repair Work
    Vinck, Dominique
    ENGINEERING STUDIES, 2019, 11 (02) : 153 - 167
  • [4] A comprehensive fuzzy risk-based maintenance framework for prioritization of medical devices
    Jamshidi, Afshin
    Rahimi, Samira Abbasgholizadeh
    Ait-kadi, Daoud
    Ruiz, Angel
    APPLIED SOFT COMPUTING, 2015, 32 : 322 - 334
  • [5] Repair, maintenance and improvement work in Finland
    Vainio, Terttu
    Jaakkonen, Liisa
    Nippala, Eero
    Lehtinen, Erkki
    Isaksson, Kaj
    VTT Tiedotteita - Valtion Teknillinen Tutkimuskeskus, 2002, (2154): : 3 - 60
  • [6] The development of quality management systems in maintenance and monitoring the process of risk-based repair work in government buildings
    Latief, Yusuf
    Machfudiyanto, Rossy Armyn
    Soepandji, Budi Susilo
    Khairina
    Aldesty, Riany
    4TH INTERNATIONAL CONFERENCE ON REHABILITATION AND MAINTENANCE IN CIVIL ENGINEERING (ICRMCE 2018), 2018, 195
  • [7] BIM-based repair and maintenance for hospital work order management
    Kamal, Zahra
    Taghaddos, Hosein
    Metvaei, Saeid
    AUTOMATION IN CONSTRUCTION, 2022, 143
  • [8] Prioritization of maintenance work in wastewater networks using decision support methods
    Mezhoud, Cherifa
    Berreksi, Ali
    Bedjou, Abdelhamid
    Bosseler, Bert
    JOURNAL OF WATER SANITATION AND HYGIENE FOR DEVELOPMENT, 2022, 12 (02) : 186 - 199
  • [9] Architecture of the remote work support system for maintenance and repair work
    Tateno, T
    Igoshi, M
    INTERNATIONAL JOURNAL OF THE JAPAN SOCIETY FOR PRECISION ENGINEERING, 1999, 33 (01): : 62 - 64
  • [10] Risk-based methods optimize maintenance work scope
    Merrick, Edwin A.
    Leonard, C. Ron
    Eckhardt, Phil
    Baughman, Harry
    Oil and Gas Journal, 1999, 97 (31):