Project Evaluation and Selection with Task Failures

被引:12
|
作者
Zhao, Wenhui [1 ]
Hall, Nicholas G. [2 ]
Liu, Zhixin [3 ]
机构
[1] Shanghai Jiao Tong Univ, Antai Coll Econ & Management, Shanghai 200030, Peoples R China
[2] Ohio State Univ, Fisher Coll Business, Columbus, OH 43210 USA
[3] Univ Michigan, Sch Management, Dearborn, MI 48128 USA
基金
中国国家自然科学基金;
关键词
project management; risk of failure; expected net present value; project evaluation and selection; NET PRESENT VALUE; CASH FLOWS; PORTFOLIO MANAGEMENT; SCHEDULING PROJECTS; PRODUCT DEVELOPMENT; MAXIMIZE; NETWORK; MODELS; PERFORMANCE; RANKING;
D O I
10.1111/poms.13107
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider a company that schedules the tasks of its projects to maximize their expected net present value (ENPV) when tasks may fail. The failure of any task terminates the project immediately. We show that for projects with certain decreasing failure rates, the ENPV optimization problem can be solved using a linear program. The main focus of our work is on how constant task failure rates contribute to decreasing project risk as tasks are completed. Under constant task failure rate, earlier completion of a task improves its probability of success and the risk profile of the project. However, it may also accelerate costs, which worsen discounted cash flow. We show the equivalence of cash flow discount rate and failure rate. Further, if task failures are independent, then the failure rates are additive. We develop a model that (a) recognizes the reduction in project risk when a task is completed, (b) implements this risk reduction into the ENPV calculation, and (c) permits optimization of the ENPV through sequencing and timing decisions for the tasks. We design an algorithm to solve the problem optimally. This enables us to validate the contributions of our work using two computational studies. The first study demonstrates a significant increase in maximum project ENPV from improved project scheduling. The second study demonstrates a significant increase in total project portfolio value as a result of better informed project selection. Our work motivates companies to develop more precise information about the failure risks of their project tasks.
引用
收藏
页码:428 / 446
页数:19
相关论文
共 50 条
  • [1] Disentangling task-selection failures from task-execution failures in task switching: an assessment of different paradigms
    Moretti, Luca
    Koch, Iring
    Steinhauser, Marco
    Schuch, Stefanie
    PSYCHOLOGICAL RESEARCH-PSYCHOLOGISCHE FORSCHUNG, 2023, 87 (03): : 929 - 950
  • [2] Disentangling task-selection failures from task-execution failures in task switching: an assessment of different paradigms
    Luca Moretti
    Iring Koch
    Marco Steinhauser
    Stefanie Schuch
    Psychological Research, 2023, 87 : 929 - 950
  • [3] PROJECT SELECTION AND EVALUATION
    JOHNSTON, RD
    LONG RANGE PLANNING, 1972, 5 (03) : 40 - &
  • [4] PROJECT EVALUATION AND SELECTION
    DIMSDALE, B
    FLATT, HP
    IBM SYSTEMS JOURNAL, 1963, 2 (SEP-D) : 200 - 217
  • [5] EVALUATION SYSTEM FOR PROJECT SELECTION
    COOPER, MJ
    RESEARCH MANAGEMENT, 1978, 21 (04): : 29 - 33
  • [6] Project evaluation and selection at TXU
    Bern, Alan
    2005/2006 IEEE/PES TRANSMISSION & DISTRIBUTION CONFERENCE & EXPOSITION, VOLS 1-3, 2006, : 1384 - 1384
  • [7] Project evaluation and selection at Aqualectra
    Martina, Steven
    2005/2006 IEEE/PES TRANSMISSION & DISTRIBUTION CONFERENCE & EXPOSITION, VOLS 1-3, 2006, : 1383 - 1383
  • [8] AN INTEGRATED APPROACH TO PROJECT EVALUATION AND SELECTION
    KHORRAMSHAHGOL, R
    AZANI, H
    GOUSTY, Y
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 1988, 35 (04) : 265 - 270
  • [9] Project evaluation and selection at MidAmerican Energy
    Chowdhury, Ali
    2005/2006 IEEE/PES TRANSMISSION & DISTRIBUTION CONFERENCE & EXPOSITION, VOLS 1-3, 2006, : 1386 - 1386
  • [10] REQUIREMENTS FOR A PROJECT EVALUATION AND SELECTION METHODOLOGY
    Santos, Claudio
    Araujo, Madalena
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON PROJECT EVALUATION (ICOPEV 2016), 2016, : 49 - 52