Assessment of risk-sharing ratio with considering budget constraint and disruption risk under a triangular Pythagorean fuzzy environment in public-private partnership projects

被引:6
|
作者
Dorfeshan, Yahya [1 ]
Taleizadeh, Ata Allah [1 ]
Toloo, Mehdi [2 ,3 ,4 ]
机构
[1] Univ Tehran, Coll Engn, Sch Ind Engn, Tehran, Iran
[2] Univ Surrey, Surrey Business Sch, Dept Business Transformat, Guildford GU2 7XH, Surrey, England
[3] Tech Univ Ostrava, Fac Econ, Dept Syst Engn, Ostrava, Czech Republic
[4] Sokolska Trida 33,Ostrava 1, Ostrava 70200, Czech Republic
关键词
Risk-sharing ratio; Fuzzy sets; Triangular Pythagorean fuzzy sets (TPFSs); Disruption risks; Public-private partnership projects (PPPPs); GOVERNMENT REVENUE GUARANTEES; MEMBERSHIP GRADES; HIGHWAY PROJECTS; DECISION-MAKING; CRITICAL PATH; ALLOCATION; MITIGATION; OPTIONS; AGGREGATION; METHODOLOGY;
D O I
10.1016/j.eswa.2022.117245
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The public-private partnership (PPP) is a practical and standard model that has been at the center of attention over the past two decades. Sharing risk between government and investors has been a challenging issue over the last year. This study formulates a model that aims to define the investors' longing and allocate risks to the government in a logical range. Besides, in some real-world conditions, foreign investors with lower cost, higher quality, and better technology than domestic investors partner with the government. Under this condition, it is essential to consider the disruption risks because of sanctions and currency price fluctuations. Furthermore, the limited budget of the government for investing in infrastructure projects is intended. In this paper, the government's disruption risks and limited budget are added to the risk-sharing ratio model for the first time in literature. Moreover, the Pythagorean fuzzy sets (PFSs) are applied to cope with the uncertainty of real-world conditions. The PFSs are more potent than classical and intuitionistic fuzzy sets (IFSs) in dealing with uncertainty. The PFSs provide the membership, non-membership, and hesitancy degree for experts to better address the derived uncertainty of real-world conditions. Also, compared with the IFSs, PFSs prepare more space, consequently providing more freedom to address the uncertainty. Finally, a case study is presented to illustrate the applicability and susceptibility of the suggested model. As disruption risks increase, general utility degree, government utility, and investor's effort decrease, and the guarantee risk ratio by government increases. Note that, investor's effort decreases because the government is forced to give the unfinished project to the domestic investor; consequently, exclusive terms arise for the domestic investor.
引用
收藏
页数:13
相关论文
共 34 条
  • [1] Research on Risk-sharing of Public-Private Partnership Project
    Wei Zhongyuan
    Ren Xu
    PROCEEDINGS OF INTERNATIONAL SYMPOSIUM - MANAGEMENT, INNOVATION & DEVELOPMENT (MID2014), 2014, : 418 - +
  • [2] Effect of the Internal Agency Problem on Risk-Sharing Incentive Contracts in Public-Private Partnership Projects
    Shi, Lei
    He, Yujia
    Onishi, Masamitsu
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (12)
  • [3] RISK ASSESSMENT AND MANAGEMENT PUBLIC-PRIVATE PARTNERSHIP PROJECTS IN THE FISHERIES
    Mnatsakanyan, Albert G.
    Ogiy, Oksana G.
    MARINE INTELLECTUAL TECHNOLOGIES, 2018, 3 (04): : 134 - 141
  • [4] Performance risk assessment in public-private partnership projects based on adaptive fuzzy cognitive map
    Chen, Hongyu
    Zhang, Limao
    Wu, Xianguo
    APPLIED SOFT COMPUTING, 2020, 93
  • [5] RISK MANAGEMENT AT REALIZATION OF INFRASTRUCTURE PROJECTS UNDER PUBLIC-PRIVATE PARTNERSHIP
    Hrytsenko, L. L.
    Krasulya, T. Y.
    ACTUAL PROBLEMS OF ECONOMICS, 2011, (126): : 85 - 90
  • [6] Review of studies on risk allocation and sharing in public-private partnership projects for infrastructure delivery
    Mazher, Khwaja Mateen
    FRONTIERS IN BUILT ENVIRONMENT, 2025, 11
  • [7] Fuzzy Integral-Based Risk-Assessment Approach for Public-Private Partnership Infrastructure Projects
    Mazher, Khwaja Mateen
    Chan, Albert P. C.
    Zahoor, Hafiz
    Khan, Mohsen Islam
    Ameyaw, Ernest Effah
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (12)
  • [8] Empirical Study of Risk Assessment and Allocation of Public-Private Partnership Projects in China
    Chan, Albert P. C.
    Yeung, John F. Y.
    Yu, Calvin C. P.
    Wang, Shou Qing
    Ke, Yongjian
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2011, 27 (03) : 136 - 148
  • [9] Risk assessment of public-private partnership in Russia based on the fuzzy logic method
    Savrukov, A. N.
    Savrukov, N. T.
    Kozlovskaya, E. A.
    VOPROSY EKONOMIKI, 2020, (10): : 132 - 143
  • [10] Fiscal Risk Management of Public-Private Partnership Projects: A Multidimensional Identification and Assessment Framework
    Xu, LiPing
    Liu, Ning
    Zhou, Linyu
    Lu, LanQi
    ENGINEERING MANAGEMENT JOURNAL, 2024, 36 (02) : 166 - 192