Alternative concession model for build operate transfer contract projects

被引:174
作者
Shen, LY [1 ]
Li, H
Li, QM
机构
[1] Hong Kong Polytech Univ, Bldg & Real Estate Dept, Kowloon, Hong Kong, Peoples R China
[2] Southeast Univ, Sch Civil Engn, Nanjing, Peoples R China
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 2002年 / 128卷 / 04期
关键词
infrastructure; build/operate/transfer; contracts; models; project management;
D O I
10.1061/(ASCE)0733-9364(2002)128:4(326)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper develops an alternative concession model for build operate transfer (BOT) infrastructure projects. The concession period is a measure for deciding when the project ownership will be transferred from the investor back to the government concerned; it also demarcates the benefits, authorities, and responsibilities between the government and private investors. Previous studies have developed various techniques and methods, mainly suggesting proper organization structure, contracting procedures, methods of project financing, and risk allocation strategies when BOT-contract projects are implemented. These works have provided effective methodologies for the development of BOT contracts. Nevertheless, it appears that little has been undertaken in studying the way to determine the concession period in a BOT contract. This paper critically reviews the principles of establishing the concession period in a BOT contract. Such a review leads to developing a quantitative model for determining a proper concession period that can protect the interests of both the government concerned and private investors. An example is given that indicates how the alternative model can be applied to determine the concession periods of BOT infrastructure projects.
引用
收藏
页码:326 / 330
页数:5
相关论文
共 9 条
[1]  
[Anonymous], J HONG KONG SURVEYOR
[2]  
*BEIJ ENG CONS COR, 1995, GUID APPL BOT PROJ, P15
[3]  
Franks J., 1998, BUILDING PROCUREMENT, P29
[4]  
HO HK, 1996, P CIB INT COUNC BUIL, P180
[5]  
Hudson W.R., 1997, INFRASTRUCTURE MANAG, p[41, 54, 171]
[6]  
JUN S, 1998, THESIS SE U CHINA, P3
[7]   Application of BOT system for infrastructure projects in China [J].
Shen, LY ;
Lee, RKH ;
Zhang, ZH .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (04) :319-323
[8]   RISKS AND GUARANTEES IN BOT TENDER [J].
TIONG, RLK .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (02) :183-188
[9]  
WALKER C, 1995, PRIVATIZED INFRASTRU, P25