Synchronization Control of Torque Cylinders for Hard Rock Tunnel Boring Machine

被引:1
|
作者
Zhang, Zhen [1 ]
Gong, Guofang [1 ]
Yang, Huayong [1 ]
Wu, Weiqiang [1 ]
Liu, Tong [1 ]
机构
[1] Zhejiang Univ, State Key Lab Fluid Power Transmiss & Control, Hangzhou 310027, Peoples R China
关键词
TBM; Vertical steering; Torque cylinders; Synchronization control; Displacement deviation;
D O I
10.1007/978-3-319-22873-0_38
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
A synchronization control system(SCS) is proposed to reduce synchronization deviation of left and right torque cylinders in vertical steering of hard rock tunnel boring machine(TBM). Hydraulic system based on proportional valves is designed after the introduction of attitude mechanism. Establishing the load model of torque cylinders, this paper carried out simulation comparison between SCS and traditional displacement control system(DCS). The results show that the deviation in SCS is 1.5 mm and 6 mm in DCS. Synchronization control system has a significant effect on reducing displacement deviation of left and right torque cylinders.
引用
收藏
页码:426 / 435
页数:10
相关论文
共 50 条
  • [1] Trajectory Tracking of Hard Rock Tunnel Boring Machine with Cascade Control Structure
    Liu, Huajiang
    Wang, Jingcheng
    Zhang, Langwen
    Zhao, Guanglei
    2014 IEEE CHINESE GUIDANCE, NAVIGATION AND CONTROL CONFERENCE (CGNCC), 2014, : 2326 - 2331
  • [2] An Adaptive Robust Control for Hard Rock Tunnel Boring Machine Cutterhead Driving System
    Shao, Chengjun
    Liao, Jianfeng
    Li, Xiuliang
    Su, Hongye
    PROCEEDINGS OF THE ASME 8TH ANNUAL DYNAMIC SYSTEMS AND CONTROL CONFERENCE, 2015, VOL 3, 2016,
  • [3] Coordinated Control for Overactuated Hard Rock Tunnel Boring Machine Cutterhead Driving System
    Liao J.
    Yao B.
    2018, Chinese Mechanical Engineering Society (54): : 107 - 112
  • [4] Dynamic modeling of gripper type hard rock tunnel boring machine
    Liao, Jianfeng
    Zhu, Xiaocong
    Yao, Bin
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2018, 71 : 166 - 179
  • [5] Research on Hard Rock Tunnel Boring Machine based on Digital Mockup
    Zhao, Xiaoxu
    Gong, Yadong
    Yao, Qiang
    MECHANICAL COMPONENTS AND CONTROL ENGINEERING III, 2014, 668-669 : 240 - 243
  • [6] Research on the Load on Cutter Head of Hard Rock Tunnel Boring Machine
    Zhao, Xiao-xu
    Gong, Ya-dong
    PROCEEDINGS OF 2014 INTERNATIONAL CONFERENCE ON MECHANICS AND MECHANICAL ENGINEERING, 2014, 684 : 303 - 307
  • [7] A fuzzy logic model to predict the performance of hard rock tunnel boring machine
    Hedayatzadeh, M.
    Hamidi, J. Khademi
    UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 1171 - 1178
  • [8] HARD ROCK TUNNEL BORING - PROGNOSIS AND COSTS
    LISLERUD, A
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 1988, 3 (01) : 9 - 17
  • [9] Research on the simulation of cutting rock rotary by hard rock tunnel boring machine disc cutters
    Liu, Jianqin
    Liu, Mengmeng
    Guo, Wei
    Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2015, 51 (09): : 199 - 205
  • [10] Assessment of Rock Drillability Prediction in Hard Rock Tunnel Boring
    Ivanicova, Lucia
    Labas, Milan
    Lazarova, Edita
    Feriancikova, Katarina
    Krulakova, Maria
    Krupa, Vit'azoslav
    PROCEEDINGS OF THE 2016 17TH INTERNATIONAL CARPATHIAN CONTROL CONFERENCE (ICCC), 2016, : 265 - 269