Hybrid intelligent water drops algorithm to unrelated parallel machines scheduling problem: a just-in-time approach

被引:29
|
作者
Kayvanfar, Vahid [1 ]
Teymourian, Ehsan [2 ]
机构
[1] Amirkabir Univ Technol, Dept Ind Engn, Tehran, Iran
[2] Mazandaran Univ Sci & Technol, Dept Ind Engn, Babol Sar, Iran
关键词
earliness and tardiness; intelligent water drops (IWD) algorithm; unrelated parallel machines; makespan; sequence-dependent set-up time (SDST); EARLINESS-TARDINESS PENALTIES; TOTAL WEIGHTED TARDINESS; COMMON DUE-DATE; SETUP TIMES; NEIGHBORHOOD SEARCH; COMPLETION-TIME; OPTIMIZATION; SEQUENCE; EARLINESS/TARDINESS; MINIMIZATION;
D O I
10.1080/00207543.2014.923124
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Minimising earliness and tardiness penalties as well as maximum completion time (makespan) simultaneously on unrelated parallel machines is tackled in this research. Jobs are sequence-dependent set-up times and due dates are distinct. Since the machines are unrelated, jobs processing time/cost on different machines may vary, i.e. each job could be processed at different processing times with regard to other machines. A mathematical model which minimises the mentioned objective is proposed which is solved optimally via lingo in small-sized cases. An intelligent water drop (IWD) algorithm, as a new swarm-based nature-inspired optimisation one, is also adopted to solve this multi-criteria problem. The IDW algorithm is inspired from natural rivers. A set of good paths among plenty of possible paths could be found via a natural river in its ways from the starting place (source) to the destination which results in eventually finding a very good path to their destination. A comprehensive computational and statistical analysis is conducted to analyse the algorithms' performances. Experimental results reveal that the proposed hybrid IWD algorithm is a trustable and proficient one in finding very good solutions, since it is already proved that the IWD algorithm has the property of the convergence in value.
引用
收藏
页码:5857 / 5879
页数:23
相关论文
共 50 条
  • [1] Intelligent Water Drops Algorithm on Parallel Machines Scheduling
    Kayvanfar, Vahid
    Teymourian, Ehsan
    Alizadeh, Koorosh Mashhadi
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND OPERATIONS MANAGEMENT (IEOM), 2015,
  • [2] Just-in-time scheduling with two competing agents on unrelated parallel machines
    Yin, Yunqiang
    Cheng, Shuenn-Ren
    Cheng, T. C. E.
    Wang, Du Juan
    Wu, Chin-Chia
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2016, 63 : 41 - 47
  • [3] A hybrid memetic algorithm for maximizing the weighted number of just-in-time jobs on unrelated parallel machines
    F. Jolai
    M. S. Amalnick
    M. Alinaghian
    M. Shakhsi-Niaei
    H. Omrani
    Journal of Intelligent Manufacturing, 2011, 22 : 247 - 261
  • [4] A hybrid memetic algorithm for maximizing the weighted number of just-in-time jobs on unrelated parallel machines
    Jolai, F.
    Amalnick, M. S.
    Alinaghian, M.
    Shakhsi-Niaei, M.
    Omrani, H.
    JOURNAL OF INTELLIGENT MANUFACTURING, 2011, 22 (02) : 247 - 261
  • [5] An intelligent water drop algorithm to identical parallel machine scheduling with controllable processing times: a just-in-time approach
    Kayvanfar, Vahid
    Zandieh, M.
    Teymourian, Ehsan
    COMPUTATIONAL & APPLIED MATHEMATICS, 2017, 36 (01): : 159 - 184
  • [6] Just-in-time scheduling of unrelated parallel machines with family setups and soft time window constraints
    Foroutan, Reza Alizadeh
    Shafipour, Milad
    Rezaeian, Javad
    Khojasteh, Yacob
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2024, 41 (08) : 692 - 715
  • [7] An intelligent water drop algorithm to identical parallel machine scheduling with controllable processing times: a just-in-time approach
    Vahid Kayvanfar
    M. Zandieh
    Ehsan Teymourian
    Computational and Applied Mathematics, 2017, 36 : 159 - 184
  • [8] Scheduling just-in-time part replenishment of the automobile assembly line with unrelated parallel machines
    Zhou, Binghai
    Peng, Tao
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART C-JOURNAL OF MECHANICAL ENGINEERING SCIENCE, 2019, 233 (14) : 5113 - 5130
  • [9] Two-Stage Genetic Algorithm for Scheduling Stochastic Unrelated Parallel Machines in a Just-in-Time Manufacturing Context
    Cao, Zhengcai
    Lin, Chengran
    Zhou, MengChu
    Zhou, Chuanguang
    Sedraoui, Khaled
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2023, 20 (02) : 936 - 949
  • [10] A SEARCH HEURISTIC FOR JUST-IN-TIME SCHEDULING IN PARALLEL MACHINES
    LAGUNA, M
    VELARDE, JLG
    JOURNAL OF INTELLIGENT MANUFACTURING, 1991, 2 (04) : 253 - 260