Solving the single crane scheduling problem at rail transshipment yards

被引:20
|
作者
Li, Xiyu [1 ]
Otto, Alena [1 ]
Pesch, Erwin [1 ,2 ]
机构
[1] Univ Siegen, Chair Management Informat Sci, Kohlbettstr 15, D-57068 Siegen, Germany
[2] HHL Leipzig, Ctr Adv Studies Management CASiM, Jahnallee 59, D-04109 Leipzig, Germany
关键词
Crane scheduling; Transshipment yard; Branch-and-cut; Asymmetric traveling salesman problem with time windows; Minimum completion time problem; TRAVELING SALESMAN PROBLEM; DYNAMIC-PROGRAMMING APPROACH; DEPENDENT SETUP TIMES; MACHINE SCHEDULE; BOUND ALGORITHM; OPERATIONS; TRAINS; JOBS;
D O I
10.1016/j.dam.2018.07.021
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
We consider single-crane scheduling at rail transshipment yards, in which gantry cranes move containers between trains, trucks and a storage area. The single-crane scheduling problem arises at single-crane transshipment terminals and as a subproblem of the multiple-crane scheduling problem. We consider a makespan objective function, which is equivalent to minimizing the train dwell time in the yard, and introduce time windows for container moves, for example, as a customer service promise. Our proposed decomposition algorithm with integrated dynamic branch-and-cut or dynamic programming solves practically relevant instances within short time limits. (C) 2018 Elsevier B.V. All rights reserved.
引用
收藏
页码:134 / 147
页数:14
相关论文
共 50 条
  • [1] Gantry crane and shuttle car scheduling in modern rail–rail transshipment yards
    Stefan Fedtke
    Nils Boysen
    OR Spectrum, 2017, 39 : 473 - 503
  • [2] Gantry crane and shuttle car scheduling in modern rail-rail transshipment yards
    Fedtke, Stefan
    Boysen, Nils
    OR SPECTRUM, 2017, 39 (02) : 473 - 503
  • [3] Determining fixed crane areas in rail-rail transshipment yards
    Boysen, Nils
    Fliedner, Matte
    Kellner, Michael
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2010, 46 (06) : 1005 - 1016
  • [4] Scheduling Freight Trains in Rail-Rail Transshipment Yards
    Boysen, Nils
    Jaehn, Florian
    Pesch, Erwin
    TRANSPORTATION SCIENCE, 2011, 45 (02) : 199 - 211
  • [5] Determining crane areas in intermodal transshipment yards: The yard partition problem
    Boysen, Nils
    Fliedner, Malte
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 204 (02) : 336 - 342
  • [6] Rail Mounted Gantry Crane Scheduling In Rail-Truck Transshipment Terminal
    Wang, Li
    Zhu, Xiaoning
    Xie, Zhengyu
    INTELLIGENT AUTOMATION AND SOFT COMPUTING, 2016, 22 (01): : 61 - 73
  • [7] How to park freight trains on rail–rail transshipment yards: the train location problem
    Michael Kellner
    Nils Boysen
    Malte Fliedner
    OR Spectrum, 2012, 34 : 535 - 561
  • [8] How to park freight trains on rail-rail transshipment yards: the train location problem
    Kellner, Michael
    Boysen, Nils
    Fliedner, Malte
    OR SPECTRUM, 2012, 34 (03) : 535 - 561
  • [9] Integrated Bay Allocation and Yard Crane Scheduling Problem for Transshipment Containers
    Lee, Der-Horng
    Jin, Jian Gang
    Chen, Jiang Hang
    TRANSPORTATION RESEARCH RECORD, 2011, (2222) : 63 - 71
  • [10] A Multi-Agent Based Simulation Model for Rail-Rail Transshipment: An Engineering Approach for Gantry Crane Scheduling
    Abourraja, Mohamed Nezar
    Oudani, Mustapha
    Samiri, Mohamed Yassine
    Boudebous, Dalila
    El Fazziki, Abdelaziz
    Najib, Mehdi
    Bouain, Abdelhadi
    Rouky, Naoufal
    IEEE ACCESS, 2017, 5 : 13142 - 13156