An NC algorithm for finding a minimum weighted completion time schedule on series parallel graphs

被引:1
|
作者
Sunder, S [1 ]
He, X [1 ]
机构
[1] SUNY BUFFALO, DEPT COMP SCI, BUFFALO, NY 14260 USA
关键词
scheduling; series parallel graphs; NC algorithms; parallel algorithm;
D O I
10.1007/BF01955675
中图分类号
TP31 [计算机软件];
学科分类号
081202 ; 0835 ;
摘要
We present a parallel algorithm for solving the minimum weighted completion time scheduling problem for transitive series parallel graphs. The algorithm takes O (log(2) n) time with O (n(3)) processors on a CREW PRAM, where n is the number of vertices of the input graph. This is the first NC algorithm for solving the problem.
引用
收藏
页码:243 / 262
页数:20
相关论文
共 50 条