ELN perspectives: From the multinational to the startup.

被引:0
|
作者
Coles, S [1 ]
机构
[1] Amphora Res Syst, Bracknell RG42 2XN, Berks, England
关键词
D O I
暂无
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
070-CINF
引用
收藏
页码:U688 / U688
页数:1
相关论文
共 50 条
  • [1] OPERATOR TRAINING FOR STARTUP.
    Wetherill, F.E.
    C.S., Wallsgrove
    Plant/operations progress, 1986, 5 (02): : 78 - 80
  • [2] KIDSTON GOLD MINES STARTUP.
    Knight, D.A.
    Medina, V.G.
    Minerals and Metallurgical Processing, 1986, 3 (01): : 45 - 49
  • [3] MIAMI METRORAIL: COUNTDOWN TO STARTUP.
    Fahrenwald, Bill
    Railway Age, 1983, 185 (12) : 52 - 55
  • [4] APPROXIMATE THEORY OF EJECTOR STARTUP.
    Khurayev, L.V.
    Vorontsov, V.D.
    Alad'yev, I.T.
    Fluid Mechanics, Soviet Research, 1975, 4 (05): : 103 - 111
  • [5] ACHIEVING QUALITY DURING PLANT STARTUP.
    Henderson, Ross
    1985, (18)
  • [6] ANALYSIS AND MODELING OF PIPE LINE DEWATERING AND STARTUP.
    Haun, Rick
    Pipe line industry Houston, Tex., 1986, 64 (02): : 37 - 41
  • [7] SPARK IGNITION ASSISTS DIESEL STARTUP.
    Phatak, R.G.
    Komiyama, K.
    SAE journal of automotive engineering, 1983, 91 (11): : 47 - 50
  • [8] INITIAL CONTROLLER SETTINGS TO USE AT PLANT STARTUP.
    Anderson, Gerald D.
    1600, (90):
  • [9] Firedamp Drainage from a Rise Longwall Face during its Startup.
    Myszor, Hubert
    Wisnirwski, Bogdan
    Przeglad Gorniczy, 1980, 36 (06): : 299 - 301
  • [10] Radiation Portal Monitor calibration 2 and startup.
    Hoyt, JR
    Shipler, DB
    Ames, KR
    Sitsler, RB
    Jones, RA
    Antonio, EJ
    HEALTH PHYSICS, 2005, 89 (01): : S64 - S64