Two-machine flow shop scheduling with two criteria:: Maximum earliness and makespan

被引:4
|
作者
Toktas, B
Azizoglu, M
Köksalan, SK
机构
[1] Middle E Tech Univ, Dept Ind Engn, TR-06531 Ankara, Turkey
[2] Univ Washington, Dept Ind Engn, Seattle, WA 98195 USA
关键词
flow shop; makespan; maximum earliness; efficient solutions;
D O I
10.1016/s0377-2217(03)00192-9
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this study we address the problem of minimizing makespan and maximum earliness simultaneously in a two-machine flow shop environment. We develop a branch-and-bound procedure that generates all efficient solutions with respect to two criteria. We propose several lower and upper bounding schemes to enhance the efficiency of the algorithm. We also propose a heuristic procedure that generates approximate efficient solutions. Our computational results reveal that the branch-and-bound procedure is capable of solving problems with up to 25 jobs and the heuristic procedure produces approximate efficient solutions that are very close to exact efficient solutions in very small computation times. (C) 2003 Elsevier B.V. All rights reserved.
引用
收藏
页码:286 / 295
页数:10
相关论文
共 50 条
  • [1] Two-machine flow shop scheduling to minimize the sum of maximum earliness and tardiness
    Moslehi, G.
    Mirzaee, M.
    Vasei, M.
    Modarres, M.
    Azaron, A.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 122 (02) : 763 - 773
  • [2] On Two-machine Flow Shop Scheduling
    Chen L.
    Luo W.-C.
    Zhang G.-C.
    Journal of the Operations Research Society of China, 2014, 2 (03) : 333 - 339
  • [3] Minimizing the makespan for the two-machine flow shop scheduling problem with random breakdown
    Faicel Hnaien
    Taha Arbaoui
    Annals of Operations Research, 2023, 328 : 1437 - 1460
  • [4] Minimizing the makespan for the two-machine flow shop scheduling problem with random breakdown
    Hnaien, Faicel
    Arbaoui, Taha
    ANNALS OF OPERATIONS RESEARCH, 2023, 328 (02) : 1437 - 1460
  • [5] Scheduling in a two-machine flow-shop for earliness/tardiness under learning effect
    Mesut Cemil İşler
    Bilal Toklu
    Veli Çelik
    The International Journal of Advanced Manufacturing Technology, 2012, 61 : 1129 - 1137
  • [6] Scheduling in a two-machine flow-shop for earliness/tardiness under learning effect
    Isler, Mesut Cemil
    Toklu, Bilal
    Celik, Veli
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 61 (9-12): : 1129 - 1137
  • [7] Scheduling three-operation jobs in a two-machine flow shop to minimize makespan
    Gupta, JND
    Koulamas, CP
    Kyparisis, GJ
    Potts, CN
    Strusevich, VA
    ANNALS OF OPERATIONS RESEARCH, 2004, 129 (1-4) : 171 - 185
  • [8] Scheduling Three-Operation Jobs in a Two-Machine Flow Shop to Minimize Makespan
    Jatinder N.D. Gupta
    Christos P. Koulamas
    George J. Kyparisis
    Chris N. Potts
    Vitaly A. Strusevich
    Annals of Operations Research, 2004, 129 : 171 - 185
  • [9] Fuzzy scheduling on two-machine flow shop
    Hong, TP
    Chuang, TN
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 1998, 6 (04) : 471 - 481
  • [10] Two-machine shop scheduling: Compromise between flexibility and makespan value
    Esswein, C
    Billaut, JC
    Strusevich, VA
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 167 (03) : 796 - 809