共 50 条
- [2] Analysis of flow instabilities for once-through steam generator Hedongli Gongcheng, 2008, 5 (43-47):
- [3] Research on Modeling and Simulation of Once-Through Steam Generator Xu, Jianqun (qlj1062@163.com), 1600, Atomic Energy Press (42): : 154 - 160
- [4] NUCLEAR ONCE-THROUGH STEAM GENERATOR TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1970, : 19 - &
- [5] Simulation Research on Dynamic Characteristics and Small Break Fault of Once-through Steam Generator Hedongli Gongcheng/Nuclear Power Engineering, 2021, 42 (02): : 161 - 167
- [6] Adaptation of PROTHOS to the once-through steam generator PROCEEDINGS OF THE AMERICAN POWER CONFERENCE, VOL 59, I AND II, 1997, 59 : 903 - 908
- [7] Adaptation of PORTHOS to the once-through steam generator PROCEEDINGS OF THE AMERICAN POWER CONFERENCE, VOL 59 - PTS I AND II, 1997, 59 : 903 - 908
- [8] Study on flow instability in annular tube once-through steam generator Yuanzineng Kexue Jishu/Atomic Energy Science and Technology, 2007, 41 (03): : 325 - 330
- [9] Research on Active Disturbance Rejection Control of Once-through Steam Generator Hedongli Gongcheng/Nuclear Power Engineering, 2022, 43 (06): : 146 - 150