The Just-In-Time Production System from the Perspective of Manpower (The case study of Iran)

被引:0
|
作者
Mousavi, Mohammad [1 ]
Rafiee, Mojtaba [2 ]
Easy, Fahimeh [3 ]
机构
[1] Khorasan Razavi State Payam Noor Univ, Tehran, Iran
[2] Markazy State Payam Noor Univ, Tehran, Iran
[3] Kabl Khodro Co, Tehran, Iran
关键词
the just-in-time production systems; manpower; pathology; optimum implementation;
D O I
暂无
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
The present study tries to work on this matter which is the case that, although technical equipments are fully supplied, why does some just-in-time production systems face failure? The main question of the study is what elements constitute manpower required indicators of the just-in-time production system? For this reason, a model was provided for determining manpower status according to the just-in-time production system conditions. The results show a meaningful difference between the current company conditions with the desired just-in-time production systems human conditions. Study results reveal that human factors are of vital importance in organization and, before investing on technical section of production, organization's manpower and human infrastructures have to be prepared.
引用
收藏
页码:269 / 273
页数:5
相关论文
共 50 条
  • [1] SIMULATING A JUST-IN-TIME PRODUCTION SYSTEM
    SARKER, BR
    COMPUTERS & INDUSTRIAL ENGINEERING, 1989, 16 (01) : 127 - 137
  • [2] A Case Study of Just-In-Time System in Service Industry
    Aradhye, A. S.
    Kallurkar, S. P.
    12TH GLOBAL CONGRESS ON MANUFACTURING AND MANAGEMENT (GCMM - 2014), 2014, 97 : 2232 - 2237
  • [3] FROM JUST-IN-CASE TO JUST-IN-TIME
    DOUGHERTY, JR
    BUSINESS SOFTWARE REVIEW, 1988, 7 (05): : 71 - &
  • [4] THE EFFECT OF IMBALANCE IN A JUST-IN-TIME PRODUCTION SYSTEM - A SIMULATION STUDY
    SARKER, BR
    HARRIS, RD
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1988, 26 (01) : 1 - 18
  • [5] JUST-IN-TIME PRODUCTION
    JAMROG, MR
    HARVARD BUSINESS REVIEW, 1987, 65 (01) : 156 - &
  • [6] A Case Study of Just-In-Time System in the Chinese Automotive Industry
    Hou, Bo
    Chan, Hing Kai
    Wang, Xiaojun
    WORLD CONGRESS ON ENGINEERING, WCE 2011, VOL I, 2011, : 904 - 908
  • [7] JUST-IN-TIME FROM A BUSINESS LOGISTICS PERSPECTIVE
    STORHAGEN, NG
    HELLBERG, R
    ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1987, 12 (1-4): : 117 - 121
  • [8] EFFECT OF IMBALANCE IN A JUST-IN-TIME PRODUCTION SYSTEM: A SIMULATION STUDY.
    Sarker, Bhaba R.
    Harris, Roy D.
    International Journal of Production Research, 1988, 26 (01): : 1 - 18
  • [9] Just-in-time is not just for manufacturing: a service perspective
    Canel, C
    Rosen, D
    Anderson, EA
    INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2000, 100 (1-2) : 51 - 60
  • [10] Just-in-Time to Just-in-Case
    Ramesh N.
    Dickerson T.
    IEEE Engineering Management Review, 2022, 50 (02): : 17 - 18