Application of Improved Critical Chain and Earned Value Technique in Software Engineering & Integrated Project Progress Control

被引:0
|
作者
Ma, Chengqian [1 ]
Hu, Weitao [1 ]
Deng, Yayin [2 ]
机构
[1] Wuhan Univ Technol, Sch Comp Sci & Technol, Wuhan, Hubei, Peoples R China
[2] Cent Hosp Wuhan, Pathol Dept, Wuhan, Hubei, Peoples R China
关键词
Software project; integrated project; critical chain; earned value; schedule control;
D O I
10.1109/iscaie.2019.8743672
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Software engineering & Integrated project includes both software development and hardware construction processes ,while its progress control is one of the main problems faced by construction units and owners. Critical chain project management minimized the risk of progress through setting a Buffer, managed stratification of the software and hardware processes of the software engineering and integrated project, compared with traditional progress management methods , which owned natural advantages. Based on the critical chain management methods, this paper proposed an improved technique which combined critical chain with the traditional earned value technique. Drawn references from the PERT Methods, this method determined the scheduled duration in three situations: unconsumed buffer, completely consumed buffer and most likely consumed buffer, transformed the critical chain project duration into traditional earned value project duration, and then carried out the earned value analysis, at the same time, the monitoring of buffer consumption was improved. The method controlled the project schedule at both external and internal levels, which improved the accuracy and flexibility of duration monitoring and conducted an empirical research by taking a software engineering and integrated project as an example.
引用
收藏
页码:136 / 142
页数:7
相关论文
共 22 条
  • [1] The Application of Improved Earned Value Management Method in Engineering Project Management
    Gao Xiuju
    MOT2009: PROCEEDINGS OF ZHENGZHOU CONFERENCE ON MANAGEMENT OF TECHNOLOGY, VOLS I AND II, 2009, : 383 - 387
  • [2] The Application of Improved Earned Value Model in Engineering Quality and Progress Coordination Management
    Gao, Xukuo
    Ye, Zhiming
    FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 4580 - 4584
  • [3] Application of improved earned value method in project management processes
    Qiao, Li-Hong
    Guo, Guang-Xin
    Yang, Zhi-Bing
    Beijing Ligong Daxue Xuebao/Transaction of Beijing Institute of Technology, 2010, 30 (01): : 33 - 36
  • [4] Application of Earned Value Method to Progress Control of Construction projects
    Czemplik, Andrzej
    XXIII R-S-P SEMINAR, THEORETICAL FOUNDATION OF CIVIL ENGINEERING (23RSP) (TFOCE 2014), 2014, 91 : 424 - 428
  • [5] Project control based on a mutual application of pert and earned value management methods
    Mishakova, Anastasiia
    Vakhrushkina, Anna
    Murgul, Vera
    Sazonova, Tatiana
    15TH INTERNATIONAL SCIENTIFIC CONFERENCE UNDERGROUND URBANISATION AS A PREREQUISITE FOR SUSTAINABLE DEVELOPMENT, 2016, 165 : 1812 - 1817
  • [6] Talk about value engineering on the cost control of software project
    Hou, Jialin
    Ding, Shuai
    Liu, Jingshan
    PROCEEDINGS OF THE SECOND INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2008, : 256 - 262
  • [7] ENGINEERING PROJECT PLANNING AND CONTROL SOFTWARE TO ENABLE THE 'ADEPT' TECHNIQUE
    Newton, Andrew
    Steele, John
    Waskett, Paul
    PROCEEDINGS OF THE 10TH INTERNATIONAL DSM CONFERENCE, 2008, : 183 - 195
  • [8] Grey critical chain project management technique and ILT application
    Feng Jnnwen
    Proceedings of 20th IPMA World Congress on Project Management, Vols 1 and 2, 2006, : 722 - 727
  • [9] A Study on Comprehensive Analysis and Control of Cost and Progress of Architectural Decoration Engineering from the Angle of Earned Value
    Chen, Baoping
    Song, Yang
    PROCEEDINGS OF THE 2017 INTERNATIONAL CONFERENCE ON EDUCATION, ECONOMICS AND MANAGEMENT RESEARCH (ICEEMR 2017), 2017, 95 : 171 - 174
  • [10] Application research on the critical chain technology in engineering project schedule management
    Zhang, Ai-Lin
    Wang, Li-Xia
    Information Technology Journal, 2013, 12 (17) : 4196 - 4199