On the design and development of object-oriented scheduling systems

被引:14
|
作者
Pinedo, M
Yen, BPC
机构
[1] COLUMBIA UNIV,DEPT IND ENGN & OPERAT RES,NEW YORK,NY 10027
[2] HONG KONG UNIV SCI & TECHNOL,DEPT IND ENGN & ENGN MANAGEMENT,HONG KONG,HONG KONG
关键词
Schedule Problem; Precedence Constraint; Object Type; Schedule System; Partial Schedule;
D O I
10.1023/A:1018986524234
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we describe the architecture of an object-oriented scheduling system. First, a mathematical framework is presented that is based on set theory and graph theory. Then a number of basic as well as more specialized methods are defined which can be applied on the entities of any decision support system. The principal objects of a scheduling system are defined, as well as the methods specifically designed for the manipulation of the schedules. The object base design, the schedule generator design and the user interface design are then discussed in detail.
引用
收藏
页码:359 / 378
页数:20
相关论文
共 50 条
  • [1] On the design and development of object-oriented scheduling systems
    Michael Pinedo
    Benjamin P.-C. Yen
    Annals of Operations Research, 1997, 70 : 359 - 378
  • [2] Object-oriented design of a modular scheduling architecture
    Brandimarte, P
    CIRP ANNALS 1999 - MANUFACTURING TECHNOLOGY, 1999, : 365 - 368
  • [3] The impact of design properties on development cost in object-oriented systems
    Briand, LC
    Wüst, J
    SEVENTH INTERNATIONAL SOFTWARE METRICS SYMPOSIUM - METRICS 2001, PROCEEDINGS, 2000, : 260 - 271
  • [4] Object-Oriented design of PLM systems
    Kul'ga K.S.
    Russian Engineering Research, 2009, 29 (12) : 1285 - 1289
  • [5] OBJECT-ORIENTED DESIGN OF MEASUREMENT SYSTEMS
    DAPONTE, P
    NIGRO, L
    TISATO, F
    IEEE TRANSACTIONS ON INSTRUMENTATION AND MEASUREMENT, 1992, 41 (06) : 874 - 880
  • [6] DESIGN FOR TESTABILITY IN OBJECT-ORIENTED SYSTEMS
    BINDER, RV
    COMMUNICATIONS OF THE ACM, 1994, 37 (09) : 87 - 101
  • [7] Development of an object-oriented scheduling model for construction projects
    Fan, SL
    Tserng, HP
    Wang, MT
    AUTOMATION IN CONSTRUCTION, 2003, 12 (03) : 283 - 302
  • [8] OBJECT-ORIENTED ANALYSIS AND DESIGN - A NEW APPROACH TO SYSTEMS-DEVELOPMENT
    GARCEAU, L
    JANCURA, E
    KNEISS, J
    JOURNAL OF SYSTEMS MANAGEMENT, 1993, 44 (01): : 25 - 32
  • [9] An object-oriented development environment to optimally design cyclic storage systems
    Jahanpour, Mohammadamin
    Afshar, Abbas
    Solis, Samuel Sandoval
    JOURNAL OF HYDROINFORMATICS, 2015, 17 (04) : 534 - 550
  • [10] Modeling development effort in object-oriented systems using design properties
    Briand, LC
    Wüst, J
    IEEE TRANSACTIONS ON SOFTWARE ENGINEERING, 2001, 27 (11) : 963 - 986