共 50 条
- [2] Extending the application of risk-informed dam safety decision making RISK ANALYSIS, DAM SAFETY, DAM SECURITY AND CRITICAL INFRASTRUCTURE MANAGEMENT, 2012, : 81 - 86
- [3] Risk-informed decision making at the Hungarian Nuclear Safety Authority PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL 1- 6, 2004, : 1415 - 1420
- [4] LOCATION DEPENDENT LOSS OF COOLANT ACCIDENT FREQUENCIES FOR RISK-INFORMED RESOLUTION OF GENERIC SAFETY ISSUE 191 PROCEEDINGS OF THE 20TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING AND THE ASME 2012 POWER CONFERENCE - 2012, VOL 4, 2012, : 139 - 147
- [5] INTEGRITY RISK-INFORMED DECISION MAKING PROCEEDINGS OF THE 12TH INTERNATIONAL PIPELINE CONFERENCE, 2018, VOL 2, 2018,
- [6] Risk-informed decision making with PARAGON™ PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL 1- 6, 2004, : 450 - 455
- [8] PSA completeness in risk-informed decision making PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL I AND II, PROCEEDINGS, 2002, : 1805 - 1810
- [9] Risk-informed decision making for remedial action PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT (PSAM 4), VOLS 1-4, 1998, : 1791 - 1796