Optimization of displacement;
Multi-fractures;
Leak-off;
Fracture height;
D O I:
暂无
中图分类号:
X [环境科学、安全科学];
学科分类号:
08 ;
0830 ;
摘要:
Two matters is often encountered in shale gas reservoir when hydraulic fracturing: (1) unlocking of naturally fractures leads to the increasing of leak-off; (2) the producing of multi-fractures induces friction resistance to bring. So tit is important to optimize the size of displacement. Generally speaking, several question should be considered :(1) There is always a turning point of optimum capacity in a well to be fractured;(2) The size of leak-off, displacement must satisfy leak-off brought by natural fractures;(3) The size of single fracture width; (4) Fracture height; (5) pipe string resistance; (6)The turning trace of fracture; (7) The joining up of fractures; (8) The relation between displacement and excessive fluid loss. All the factors should be considered to optimize displacement. The examples of its application are given.
引用
收藏
页码:604 / 608
页数:5
相关论文
共 4 条
[1]
Economides M.J., 2002, RESERVOIR STIMULATIO
[2]
Hallam S.D., 1990, 20656 SPE
[3]
Schechter Roberts., 2005, OIL WELL STIMULATION