Unavailability evaluation and allocation at the design stage for electric power plants: Methods and tools

被引:0
|
作者
Bouissou, M
Bourgade, E
机构
关键词
availability; allocation; electric power plant; optimization; life-cycle cost;
D O I
10.1109/RAMS.1997.571670
中图分类号
TP31 [计算机软件];
学科分类号
081202 ; 0835 ;
摘要
Electricite de France is currently carrying out a project called CIDEM with the objective of integrating availability, operational feedback, and maintenance in the design of future power plants (especially nuclear power plants) in order to improve their profitability. The work reported in this paper was performed in the framework of the research part of the CIDEM project, managed by the R&D division of EDF. The paper shows that the availability assessment of an electric power plant raises a number of specific modeling problems. These problems are especially acute in the case of nuclear plants, for which safety procedures can affect availability. In fact, a dynamic simulation model could easily take into account all the particular features of the plant operation. But the quantification of such models (which are not Markovian) necessarily relies on Monte-Carlo simulation, and thus is rather slow. Computation times could still be acceptable for evaluation purposes. But in the design stage, we need to allocate the global objectives (in terms of availability, costs) to the main functions and/or components of the plant. If the system to be studied is a bit more complex than a simple series assembly of components (which means that the sum of the components' unavailabilitites is a fairly good approximation of the global unavailability), doing an allocation requires numerous evaluations. This makes the use of a simulation model totally unthinkable. This is why we have chosen to use only fault-tree models, in spite of the fact that they are essentially static models: they can be calculated in very short times, especially with the new generation of fault-tree processing codes, based on BDDs (Binary Decision Diagrams). The paper gives the modeling schemes we had to devise in order to take into account various dynamic features, along with an estimation of the corresponding errors. It also gives a quick description of the tools we use to carry out real studies : the FIGARO workbench, which enables the building of knowledge bases to automate the fault-tree construction, and the ARPO tool, to perform allocation, with two different methods.
引用
收藏
页码:91 / 99
页数:9
相关论文
共 50 条
  • [1] Optimal Allocation of Photovoltaic Plants in Electric Power Distribution Networks
    dos Santos, Igor Soares
    Saavedra, Osvaldo R.
    de Lima, Shigeaki Leite
    2015 IEEE PES INNOVATIVE SMART GRID TECHNOLOGIES LATIN AMERICA (ISGT LATAM), 2015, : 811 - 816
  • [2] Calculation methods for electric energy price of power plants
    Tan, ZF
    Han, Y
    PROCEEDINGS OF THE 2001 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, VOLS I AND II, 2001, : 1856 - 1861
  • [3] Investigation of a two stage Rankine cycle for electric power plants
    Liu, Bo
    Riviere, Philippe
    Coquelet, Christophe
    Gicquel, Renaud
    David, Franck
    APPLIED ENERGY, 2012, 100 : 285 - 294
  • [4] INVESTIGATION OF THE PERFORMANCE OF A THREE STAGE COMBINED POWER CYCLE FOR ELECTRIC POWER PLANTS
    Reddy, Pereddy Nageswara
    Rao, J. S.
    PROCEEDINGS OF THE ASME POWER CONFERENCE, 2019, 2019,
  • [5] Aggressive Control Design for Electric Power Generation Plants
    Dritsas, Leonidas
    Kontouras, Efstathios
    Kitsios, Ioannis
    Tzes, Anthony
    2018 26TH MEDITERRANEAN CONFERENCE ON CONTROL AND AUTOMATION (MED), 2018, : 667 - 672
  • [6] Magnetic design of a switched reluctance motor for electric power tools
    Wolff, Juergen
    Novender, Wolf-Rainer
    PRZEGLAD ELEKTROTECHNICZNY, 2007, 83 (10): : 126 - 134
  • [7] Evaluation of safety of nuclear power plants at the stage of designing
    Ershov, G.A.
    Kozlov, Yu.I.
    Solodovnikov, A.S.
    Mozhaev, A.S.
    Tyazheloe Mashinostroenie, 2004, (08): : 33 - 39
  • [8] Magnetic design of a switched reluctance motor for electric power tools
    Wolff, Juergen
    Novender, Wolf-Rainer
    2007 COMPATIBILITY IN POWER ELECTRONICS, 2007, : 206 - +
  • [9] Seismic Design and Evaluation of Electric Power Facility
    Journal of the Institute of Electrical Engineers of Japan, 2020, 140 (11): : 728 - 731
  • [10] Design stage evaluation tools for residential dementia care environments
    Quirke, Martin
    Ostwald, Michael J.
    Fleming, Richard
    Taylor, Mark
    Williams, Anthony
    FACILITIES, 2021, 39 (13-14) : 828 - 842