共 50 条
- [3] Optimal production run length for an unreliable production system based on product warranty policy Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2009, 31 (02): : 479 - 483
- [8] Optimal Repair-replace Strategy for Products Sold Under Warranty PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND INDUSTRIAL ENGINEERING, VOLS I AND II, 2010, : 530 - 533