Integrated optimization of the building envelope and the HVAC system in nZEB refurbishment

被引:27
|
作者
Delac, Boris [1 ]
Pavkovic, Branimir [1 ]
Lenic, Kristian [1 ]
Maderic, Damir [2 ]
机构
[1] Univ Rijeka, Fac Engn, Dept Thermodynam & Energy Engn, Vukovarska 58, Rijeka, Croatia
[2] Univ North, Mech Engn Dept, 104 Brigade 3, Varazhdin 42000, Croatia
关键词
HVAC; Optimization; Nearly zero energy building; Cost optimal; MULTIOBJECTIVE OPTIMIZATION; ENERGY-CONSUMPTION; COST-OPTIMALITY; DESIGN; RETROFIT; ACHIEVE; HOTEL;
D O I
10.1016/j.applthermaleng.2022.118442
中图分类号
O414.1 [热力学];
学科分类号
摘要
The research presents the method for optimization of a building with its heating, ventilation and air-conditioning (HVAC) system in the scope of achieving nearly zero energy building (nZEB) in the context of Energy Performance of Buildings Directive 2010/31/EU. The method is based on coupling the dynamic simulation models created in Trnsys software with the non-dominated sorting genetic algorithm (NSGA-II), as the engine which performs an optimization process to minimize global cost (GC) and primary energy consumption (PEC). The optimization comprises energy efficiency measures (EEM) on a building envelope with a parametrized model of the HVAC system. The procedure implements building simulations under design weather conditions for heating and cooling to establish the connection between building design and the HVAC system size. The analysis is performed using discrete equipment sizes and specifications according to manufacturers' data, ensuring the selection of actual products with their sizes and costs. In continuation annual simulations using referent year data were performed. Several HVAC systems were considered, ranging from conventional natural gas-based systems to systems based on renewable energy sources (RES). The method is applied in the case study of the refurbishment of a representative hotel building on the Croatian Adriatic. The results reveal a large gap in terms of PEC between the nZEB system (biomass boiler, solar thermal collectors and absorption chiller, 138.9 kWh/m(2)) and the cost-optimal system (natural gas boiler and compression chiller, 269.6 kWh/m(2)). The most promising solution for a hotel with year-round operation character is water-to-water heat pump system using seawater as the heat source and sink (170.2 kWh/m(2)). When the use of seawater is not possible, or when cooling energy prevails over heating energy use, air-to-water heat pump system appears to be suitable solution (176.4 kWh/m(2)). It is found that in addition to HVAC system with low PEC, the application of solar photovoltaic (PV) system is required to reach Croatian nZEB target for a renewed hotel (115 kWh/m(2)). Further analysis of the results shows that the optimal parameters of EEM vary depending on applied HVAC system. The results indicate that optimal solutions are achieved when the HVAC system size matches the design load. Therefore, excessive oversizing of the HVAC system may have negative impact on GC. Based on the results and the findings, conclusions and general guidelines for the refurbishment of a hotel building on the Adriatic coast are established.
引用
收藏
页数:23
相关论文
共 50 条
  • [1] Integrated optimization of the building envelope and the HVAC system in office building retrofitting
    Cui, Wenjing
    Liu, Guiwen
    Wang, Yanyan
    Li, Kaijian
    CASE STUDIES IN THERMAL ENGINEERING, 2024, 62
  • [2] Observational study on perimeterless HVAC system integrated with building envelope system : Erimeterless HVAC system integrated with
    Ichinose, Masayuki
    Inoue, Takashi
    Seki, Yusuke
    Yokota, Takefumi
    Journal of Environmental Engineering, 2009, 74 (639) : 651 - 658
  • [3] Optimization based integrated control of building HVAC system
    Zhe Liu
    Fangting Song
    Ziyan Jiang
    Xi Chen
    Xiaohong Guan
    Building Simulation, 2014, 7 : 375 - 387
  • [4] Optimization based integrated control of building HVAC system
    Liu, Zhe
    Song, Fangting
    Jiang, Ziyan
    Chen, Xi
    Guan, Xiaohong
    BUILDING SIMULATION, 2014, 7 (04) : 375 - 387
  • [5] BUILDING ENVELOPE SYSTEM - THE OTHER PART OF THE HVAC SYSTEM
    MORGENROTH, DE
    ASHRAE JOURNAL-AMERICAN SOCIETY OF HEATING REFRIGERATING AND AIR-CONDITIONING ENGINEERS, 1982, 24 (03): : 50 - 51
  • [6] HVAC system optimization - In-building section
    Lu, L
    Cai, WJ
    Soh, YC
    Li, SY
    PROCEEDINGS OF THE 4TH INTERNATIONAL SYMPOSIUM ON HEATING, VENTILATING AND AIR CONDITIONING, VOLS 1 AND 2, 2003, : 622 - 631
  • [7] HVAC system optimization - in-building section
    Lu, L
    Cai, WJ
    Xie, LH
    Li, SJ
    Soh, YC
    ENERGY AND BUILDINGS, 2005, 37 (01) : 11 - 22
  • [8] eREN Energetic refurbishment - a global approach for the building envelope
    Rinquet, Lionel
    Schwa, Stefanie
    CISBAT 2017 INTERNATIONAL CONFERENCE FUTURE BUILDINGS & DISTRICTS - ENERGY EFFICIENCY FROM NANO TO URBAN SCALE, 2017, 122 : 109 - 114
  • [9] Monitoring Indicators of the Building Envelope for the Optimisation of the Refurbishment Processes
    Serghides, Despina K.
    Dimitriou, Stella
    Katafygiotou, Martha C.
    Chatzinikola, Chryso
    NEW ARCH-INTERNATIONAL JOURNAL OF CONTEMPORARY ARCHITECTURE, 2016, 3 (01): : 1 - 10
  • [10] INNOVATIVE MATERIALS AND TECHNOLOGIES FOR A NEW ENVELOPE SYSTEM IN THE SUSTAINABLE REFURBISHMENT OF EXISTING BUILDING STOCK
    Mazzoli, Cecilia
    Fusco, Omar
    Guardigli, Luca
    Gulli, Riccardo
    SUSTAINABLE BUILDING AND REFURBISHMENT FOR NEXT GENERATIONS, 2013, : 405 - 408