Optimal Pair of Minimal Paths Under Both Time and Budget Constraints

被引:11
|
作者
Lin, Yi-Kuei [1 ]
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Ind Management, Taipei 106, Taiwan
关键词
Budget; network reliability; optimal pair; quickest path (QP); time constraint; two minimal paths (MPs); STOCHASTIC-FLOW NETWORK; QUICKEST PATH; RELIABILITY EVALUATION; MULTISTATE COMPONENTS; ALGORITHM; SYSTEMS; CUTSETS; TERMS;
D O I
10.1109/TSMCA.2009.2013193
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
The quickest path (QP) problem is to find a path which sends a given amount of data from the source to the sink such that the transmission time is minimized. Two attributes are involved, namely, the capacity and the lead time. The capacity of each arc is assumed to be deterministic. However, in many real-life flow networks such as computer systems, telecommunication systems, etc., the capacity of each arc should be stochastic due to failure, maintenance, etc. Such a network is named a stochastic-flow network. Hence, the minimum transmission time is not a fixed number. We modify the QP problem to a stochastic case. The new problem is to evaluate the probability that d units of data can be sent from the source to the sink under both time T and budget B constraints. Such a probability is named the system reliability. In particular, the data can be transmitted through two disjoint minimal paths (MPs) simultaneously. A simple algorithm is proposed to generate all (d, T, B)-QPs, and the system reliability can subsequently be computed. The optimal pair of MPs with highest system reliability could further be obtained.
引用
收藏
页码:619 / 625
页数:7
相关论文
共 50 条
  • [1] Reliability of k Separate Minimal Paths Under Both Time and Budget Constraints
    Lin, Yi-Kuei
    IEEE TRANSACTIONS ON RELIABILITY, 2010, 59 (01) : 183 - 190
  • [2] Calculation of minimal capacity vectors through k minimal paths under budget and time constraints
    Lin, Yi-Kuei
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 200 (01) : 160 - 169
  • [3] Reliability of spare routing via intersectional minimal paths within budget and time constraints by simulation
    Lin, Yi-Kuei
    Huang, Cheng-Fu
    Chang, Chin-Chia
    ANNALS OF OPERATIONS RESEARCH, 2022, 312 (01) : 345 - 368
  • [4] Reliability of spare routing via intersectional minimal paths within budget and time constraints by simulation
    Yi-Kuei Lin
    Cheng-Fu Huang
    Chin-Chia Chang
    Annals of Operations Research, 2022, 312 : 345 - 368
  • [5] Optimal State Surveillance under Budget Constraints
    Bommannavar, Praveen
    Bambos, Nicholas
    EMERGING 2010: THE SECOND INTERNATIONAL CONFERENCE ON EMERGING NETWORK INTELLIGENCE, 2010, : 68 - 73
  • [6] Finding optimal tour schedules on transportation paths under extended time window constraints
    Stefan Bock
    Journal of Scheduling, 2016, 19 : 527 - 546
  • [7] Finding optimal tour schedules on transportation paths under extended time window constraints
    Bock, Stefan
    JOURNAL OF SCHEDULING, 2016, 19 (05) : 527 - 546
  • [8] Optimal targeting under budget constraints in a humanitarian context
    Verme, Paolo
    Gigliarano, Chiara
    WORLD DEVELOPMENT, 2019, 119 : 224 - 233
  • [9] Optimal gathering protocols on paths under interference constraints
    Bermond, Jean-Claude
    Correa, Ricardo C.
    Yu, Minli
    DISCRETE MATHEMATICS, 2009, 309 (18) : 5574 - 5587
  • [10] Finding shortest paths under time-bandwidth constraints by using elliptical minimal search area
    Han, Lee D.
    Wang, Hui
    Mackey, William F., Jr.
    TRANSPORTATION RESEARCH RECORD-SERIES, 2006, (1977): : 225 - 233