This paper describes the design process followed by Westinghouse Electric South Africa for the insertion of hot internals into the Reactivity Control System (RCS) and Reserve Shutdown System (RSS) Units Under Test (UUTs) at the Helium Test Facility (HTF) at Pelindaba, South Africa. The aim of the UUTs is to allow the validation of the high temperature operation of the RCS and RSS systems for implementation into the proposed Demonstration Power Plant of the PBMR. The units use electrical heaters to obtain pebble-bed reactor thermal conditions for both the control rods and small absorber spheres (SAS) under a pressurized helium environment. Design challenges include providing for strength under elevated temperatures (900 C maximum); pressure boundary integrity (9MPa maximum); separation of different volumes (representing core barrel, reactor citadel and other Reactor Pressure Vessel (RPV) volumes); thermal protection of carbon steel vessels by using thermal insulation; allowing for diverse thermal expansion coefficients of different materials; allowing for depressurization events within the insulation and internals; having access for temperature, pressure, stress and proximity sensors and electrical wiring through high pressure penetrations; and provision for assembly of the hot internals both on and off-site. Several thermal analyses using Computational Fluid Dynamics (CFD) were performed to evaluate both worst-case and operational conditions of the UUTs. Factors that were considered include thermal insulation properties, heat transfer modes (internal radiation, external radiation and natural convection, forced internal convection for cooling) and operating pressure (ranging from 1 to 9MPa). The thermal design uses elements originally proposed for hot gas duct design. The results obtained show that the proposed design satisfies ASME VIII requirements of the pressure boundary and that all challenges are successfully met.
引用
收藏
页码:657 / 665
页数:9
相关论文
共 50 条
  • [1] Analysis for design optimization of high thrust liquid engine hot test facility
    Sharma, Abhishek
    Tharakan, T. John
    Kumar, S. Sunil
    ACTA ASTRONAUTICA, 2022, 193 (653-666) : 653 - 666
  • [2] Construction of hot helium leak test facility for ITER blanket shield block
    Chang, Jun -sung
    Kim, Sa-woong
    Chung, Si-kun
    Nam, Kwan-woo
    Kim, Duck-Hoi
    Kim, Hyun-Soo
    Lee, Hyeon-Gon
    Jung, Ki-Jung
    FUSION ENGINEERING AND DESIGN, 2023, 193
  • [4] MECHANICAL DESIGN AND TESTING OF A HOT-GAS TURBINE ON A TEST FACILITY
    STAUDE, R
    ATOMKERNENERGIE-KERNTECHNIK, 1981, 39 (02): : 121 - 127
  • [5] Design and performance of an automated test facility for hot-compression testing
    Cheng, YW
    Filla, BJ
    Tobler, RL
    JOURNAL OF TESTING AND EVALUATION, 1998, 26 (01) : 38 - 44
  • [6] Thermal Design and Experimental Verification of Double Helium Gap Conduction Test Facility
    Yang, Hongyi
    Li, Song
    Zhou, Zhiwei
    NUCLEAR SCIENCE AND ENGINEERING, 2021, 195 (04) : 339 - 348
  • [7] Design of Control System for the Super-X Test Facility
    Zhang, Shuqing
    Shi, Yi
    Ma, Shuliang
    Kuang, Zheng
    Liu, Mingliang
    Hu, Libiao
    Liu, Huajun
    Qin, Jinggang
    Liu, Fang
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2024, 34 (03) : 1 - 5
  • [8] Design and operation of the sub-cooled helium test facility for the LHD helical coils
    Hishinuma, Y
    Imagawa, S
    Yanagi, N
    Mito, T
    Nishimura, A
    Yamada, S
    Takahata, K
    Chikaraishi, H
    Tamura, H
    Iwamoto, A
    Hamaguchi, S
    Seo, K
    Honda, T
    Shinba, T
    Yoshinaga, S
    Satoh, M
    Kakui, H
    Motojima, O
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2004, 14 (02) : 1435 - 1438
  • [9] Costing RAM design and test analysis model for production facility
    Hwang, HS
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2005, 98 (02) : 143 - 149
  • [10] Analysis of a shield design for a DT neutron generator test facility
    Chichester, D. L.
    Pierce, G. D.
    APPLIED RADIATION AND ISOTOPES, 2007, 65 (10) : 1125 - 1133