A bibliography of non-deterministic lot-sizing models

被引:73
作者
Aloulou, Mohamed Ali [1 ]
Dolgui, Alexandre [2 ]
Kovalyov, Mikhail Y. [3 ]
机构
[1] Univ Paris 09, PSL, CNRS, LAMSADE UMR 7243, F-75775 Paris 16, France
[2] Ecole Mines St Etienne, LIMOS UMR 6158, CNRS, F-42023 St Etienne 2, France
[3] Natl Acad Sci Belarus, United Inst Informat Problems, Minsk, BELARUS
关键词
lot-sizing; inventory management; uncertainty; production management; PRODUCTION-INVENTORY MODEL; ECONOMIC ORDER QUANTITY; DETERIORATING PRODUCTION PROCESSES; RANDOM MACHINE UNAVAILABILITY; UNRELIABLE PRODUCTION SYSTEM; INTERRUPTED GEOMETRIC YIELD; MASTER PRODUCTION SCHEDULE; SUPPLY-CHAIN MODEL; SHORT LIFE-CYCLE; STOCHASTIC DEMAND;
D O I
10.1080/00207543.2013.855336
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Non-deterministic lot-sizing models are considered which serve for an explicit determination of lot sizes in an uncertain environment. Taxonomy components for such models are suggested and a bibliography structured according to these components is presented. The taxonomy components are numeric characteristics of a lot-sizing problem, names of uncertain parameters and names of approaches to model the uncertainty. The bibliography covers more than 300 publications since the year 2000.
引用
收藏
页码:2293 / 2310
页数:18
相关论文
共 329 条
[1]   A novel decomposition approach for on-line lot-sizing [J].
Aarts, EHL ;
Reijnhoudt, MF ;
Stehouwer, HP ;
Wessels, J .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 122 (02) :339-353
[2]   Generalized production planning problem under interval uncertainty [J].
Abass, Samir A. ;
Gomaa, Mohamed Ali ;
Elsharawy, Gaber A. ;
Elsaid, Marwa Sh. .
EGYPTIAN INFORMATICS JOURNAL, 2010, 11 (01) :27-31
[3]   Economic lot sizing with the consideration of random machine unavailability time [J].
Abboud, NE ;
Jaber, MY ;
Noueihed, NA .
COMPUTERS & OPERATIONS RESEARCH, 2000, 27 (04) :335-351
[4]   The capacitated newsboy problem with random yield: The Gardener Problem [J].
Abdel-Malek, Layek ;
Montanari, Roberto ;
Meneghetti, Diego .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 115 (01) :113-127
[5]   An integrated production and preventive maintenance planning model [J].
Aghezzaf, E. H. ;
Jamali, M. A. ;
Ait-Kadi, D. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 181 (02) :679-685
[6]   Models for robust tactical planning in multi-stage production systems with uncertain demands [J].
Aghezzaf, El-Houssaine ;
Sitompul, Carles ;
Najid, Najib M. .
COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (05) :880-889
[7]   Lot sizing with random yields and tardiness costs [J].
Agnihothri, S ;
Lee, JS ;
Kim, J .
COMPUTERS & OPERATIONS RESEARCH, 2000, 27 (05) :437-459
[8]  
Agrawal N, 2002, PROD OPER MANAG, V11, P157, DOI 10.1111/j.1937-5956.2002.tb00489.x
[9]  
Agrawal V., 2000, Manufacturing & Service Operations Management, V2, P410, DOI 10.1287/msom.2.4.410.12339
[10]   Coherent risk measures in inventory problems [J].
Ahmed, Shabbir ;
Cakmak, Ulas ;
Shapiro, Alexander .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 182 (01) :226-238