共 50 条
- [1] Research on periodic maintenance schedules of large-scale equipment based on maintenance knowledge Jiang, W. (jwy126@126.com), 1600, Binary Information Press, Flat F 8th Floor, Block 3, Tanner Garden, 18 Tanner Road, Hong Kong (10):
- [3] Fatigue Analysis of the Bridge-Type Grab Ship Unloader Based on Finite Element Method ADVANCES IN MANUFACTURING SCIENCE AND ENGINEERING, PTS 1-4, 2013, 712-715 : 1006 - +
- [6] Research on Combined Lifting Conceptual Design for Large-scale Ship MANUFACTURING SCIENCE AND TECHNOLOGY, PTS 1-3, 2011, 295-297 : 473 - +
- [7] Large-Scale Assessment of the Effect of Popularity on the Reliability of Research PLOS ONE, 2009, 4 (06):
- [9] LARGE-SCALE PLANT MAINTENANCE ELEKTROTECHNISCHE ZEITSCHRIFT B-AUSGABE, 1976, 28 (19): : 639 - 640
- [10] Pointed maintenance strategy of the mining large-scale lifting mechanical equipment Proceedings of the 2005 International Conference on Management Science and Engineering, 2005, : 193 - 198