Incentive Contracts in Projects with Unforeseeable Uncertainty

被引:30
|
作者
Sommer, Svenja C. [1 ]
Loch, Christoph H. [2 ]
机构
[1] HEC Sch Management, F-78351 Jouy En Josas, France
[2] INSEAD, F-77305 Fontainebleau, France
关键词
incentives; incomplete contracts; unforeseeable uncertainty; adjustment clause; PSYCHOLOGICAL CONTRACT; DECISION-MAKING; FAIR PROCESS; INNOVATION; MODEL; PREFERENCES; COMPLEXITY; JUSTICE; CHOICE; COSTS;
D O I
10.1111/j.1937-5956.2009.01015.x
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Designing incentive contracts that constructively guide employee efforts is a particularly difficult challenge in novel innovation initiatives, where unforeseen events may occur. Empirical studies have observed a variety of incentive structures in innovation settings: "time and material contracts" (compensation for executing orders), "downside protection" (target-driven incentives with protection from unexpected risks), and "upside rewards" (additional remuneration for pursuing opportunities). This paper develops a model of incentives in presence of unforeseen events and offers a theoretical prediction of which of the empirically observed incentive structures should be used under which circumstances. The combination of three key influences drives the shape of the best incentive contract. First, the presence of unforeseeable uncertainty, or the occurrence of events that cannot possibly be foreseen at the outset. These may force a change in the project's plan, making pure target setting insufficient. Second, fairness concerns dictate that the employee's expected compensation cannot be shifted downward by unforeseen events, because it would cause demotivation, hostility, and defection. Third, management may not be able to observe the detailed actions of the employee (moral hazard) nor whether a positive or negative unforeseen event has occurred (asymmetric information).
引用
收藏
页码:185 / 196
页数:12
相关论文
共 50 条
  • [1] Selectionism and learning in projects with complexity and unforeseeable uncertainty
    Sommer, SC
    Loch, CH
    MANAGEMENT SCIENCE, 2004, 50 (10) : 1334 - 1347
  • [2] Incentive contracts for development projects
    Finley, David T.
    Smith, Byron
    DeGroff, Bill
    MODELING, SYSTEMS ENGINEERING, AND PROJECT MANAGEMENT FOR ASTRONOMY V, 2012, 8449
  • [3] UNCERTAINTY AND THE BIDDING FOR INCENTIVE CONTRACTS
    HOLT, CA
    AMERICAN ECONOMIC REVIEW, 1979, 69 (04): : 697 - 705
  • [4] Determining Factors in the Unforeseeable Uncertainty Management in Innovation Projects
    Segger Macri Russo, Rosana de Fatima
    Sbragia, Roberto
    Oih Yu, Abraham Sin
    2013 PROCEEDINGS OF TECHNOLOGY MANAGEMENT IN THE IT-DRIVEN SERVICES (PICMET'13), 2013, : 623 - 634
  • [5] Incentive Contracts in Serial Stochastic Projects
    Chen, Tony
    Klastorin, Ted
    Wagner, Michael R.
    M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT, 2015, 17 (03) : 290 - 301
  • [6] UNCERTAINTY AND INCENTIVE EFFECTS IN SHARE CONTRACTS
    HIEBERT, LD
    AMERICAN JOURNAL OF AGRICULTURAL ECONOMICS, 1978, 60 (03) : 536 - 539
  • [7] Uncertainty, legal liability, and incentive contracts
    Evans, John H., III
    Kim, Kyonghee
    Nagarajan, Nandu J.
    ACCOUNTING REVIEW, 2006, 81 (05): : 1045 - 1071
  • [8] Setting maximum incentive for incentive/disincentive contracts for highway projects
    Shr, JF
    Chen, WT
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2004, 130 (01): : 84 - 93
  • [9] The strategy of parallel approaches in projects with unforeseeable uncertainty: The Manhattan case in retrospect
    Lenfle, Sylvain
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (04) : 359 - 373
  • [10] Incentive contracts in construction projects: Practitioner attitudes and experiences
    Badenfelt, Ulrika
    Kadefors, Anna
    PROCEEDINGS OF IRNOP VII PROJECT RESEARCH CONFERENCE, 2006, : 133 - 140