Contracting Methods for Integrated Project Delivery: A Healthcare Case Study

被引:0
|
作者
Mulholland, Sean [1 ]
Clevenger, Caroline [1 ]
机构
[1] Univ Colorado, Dept Civil Engn, Construct Engn & Management, 1200 Larimer, Denver, CO 80204 USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Contracting methods for commercial construction projects utilizing an integrated project delivery (IPD) method vary based on experience, company culture, and sophistication of project participants. This research compares and contrasts contracting methods across two concurrent hospital construction projects in Colorado's Denver metro region. One facility had a project value of roughly $ 160 million. The second had a project value of roughly $ 110 million. This research compares pre-construction data as well as findings from a short survey of project participants to analyze differences in contracting methods and outcomes. Several of the contractors and designers surveyed worked on one or more projects resulting in reliable direct comparison analysis. Metrics for comparison include: average time to negotiate and implement the project-unique contracts, impacts on profit, and design/construction productivity. Preliminary findings suggest that differences in contracting methodology and types of contracts used primarily impacts relationships, but also has possible impacts on pre-construction productivity.
引用
收藏
页码:191 / 201
页数:11
相关论文
共 50 条
  • [1] Sharing Tacit Knowledge for Integrated Project Team Flexibility: Case Study of Integrated Project Delivery
    Zhang, Lianying
    He, Jing
    Zhou, Shuguo
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (07) : 795 - 804
  • [2] Modelling of Efficiency Evaluation of Traditional Project Delivery Methods and Integrated Project Delivery (IPD)
    Trach, Roman
    Polonski, Mieczyslaw
    Hrytsiuk, Petro
    3RD WORLD MULTIDISCIPLINARY CIVIL ENGINEERING, ARCHITECTURE, URBAN PLANNING SYMPOSIUM (WMCAUS 2018), 2019, 471
  • [3] Integrated Project Delivery Case Study: Guidelines for Drafting Partnering Contract
    El-adaway, Islam H.
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2010, 2 (04) : 248 - 254
  • [4] Integrated Project Delivery (IPD): An Updated Review and Analysis Case Study
    Viana M.L.
    Hadikusumo B.H.W.
    Mohammad M.Z.
    Kahvandi Z.
    Journal of Engineering, Project, and Production Management, 2020, 10 (02): : 147 - 161
  • [5] Designing an integrated Project, Program and Portfolio System- A Case Study of Healthcare
    Gronevall, Richard
    Danilovic, Mike
    RISK AND CHANGE MANAGEMENT IN COMPLEX SYSTEMS, 2014, : 309 - 318
  • [6] Digital Modeling, Integrated Project Delivery and Industry Transformation: An Australian Case Study
    Kraatz, Judy A.
    Sanchez, Adriana X.
    Hampson, Keith D.
    BUILDINGS, 2014, 4 (03) : 453 - 466
  • [7] Transforming project delivery: integrated project delivery
    Ashcraft, Howard
    OXFORD REVIEW OF ECONOMIC POLICY, 2022, 38 (02) : 369 - 384
  • [8] Integrated project delivery (IPD) method with BIM to improve the project performance: a case study in the Republic of Iraq
    Salim M.S.
    Mahjoob A.M.R.
    Asian Journal of Civil Engineering, 2020, 21 (6) : 947 - 957
  • [9] Integrated care delivery system for mental illness: A case study of Intermountain Healthcare (USA)
    Briot, Pascal
    Brechat, Pierre-Henri
    Reiss-Brennan, Brenda
    Cannon, Wayne
    Brechat, Nathalie
    Teil, Alice
    SANTE PUBLIQUE, 2015, 27 : S199 - S208
  • [10] Effects of the Integrated Healthcare Delivery System on 270 pilot cities in 2016: a mixed methods study
    Zhao, Rui
    Li, Yuzhao
    Liu, Chunping
    Zhao, Kun
    LANCET, 2017, 390 : S101 - S101