Planning under resource constraints

被引:0
|
作者
Koehler, J [1 ]
机构
[1] Univ Freiburg, D-79110 Freiburg, Germany
关键词
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper outlines the basic principles underlying reasoning about resources in IPP, which is a classical planner based on planning graphs originally introduced with the GRAPHPLAN system. The main idea is to deal with resources in a strictly action-centered way, i.e., one specifies how each action consumes or produces resources, but no explicit temporal model is used. This avoids the computational problems of solving general constraint satisfaction problems by using instead interval arithmetics and propagation of resource requirements over time steps in the planning graph.
引用
收藏
页码:489 / 493
页数:5
相关论文
共 50 条
  • [1] Optimal production planning under resource constraints
    Chandra Mouli, K. V. V.
    Venkata Subbaiah, K.
    Acharyulu, S. G.
    JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 2006, 65 (12): : 966 - 969
  • [2] STRATEGIC-PLANNING UNDER RESOURCE CONSTRAINTS
    NAOR, J
    BUSINESS, 1981, 31 (05): : 15 - 19
  • [3] Preallocation and Planning Under Stochastic Resource Constraints
    de Nijs, Frits
    Spaan, Matthijs T. J.
    de Weerdt, Mathijs M.
    THIRTY-SECOND AAAI CONFERENCE ON ARTIFICIAL INTELLIGENCE / THIRTIETH INNOVATIVE APPLICATIONS OF ARTIFICIAL INTELLIGENCE CONFERENCE / EIGHTH AAAI SYMPOSIUM ON EDUCATIONAL ADVANCES IN ARTIFICIAL INTELLIGENCE, 2018, : 4662 - 4669
  • [4] Quantitative studies in software release planning under risk and resource constraints
    Ruhe, G
    Greer, D
    2003 INTERNATIONAL SYMPOSIUM ON EMPIRICAL SOFTWARE ENGINEERING, PROCEEDINGS, 2003, : 262 - 271
  • [5] A DYNAMIC PLANNING TECHNIQUE FOR CONTINUOUS ACTIVITIES UNDER MULTIPLE RESOURCE CONSTRAINTS
    OZDEN, M
    MANAGEMENT SCIENCE, 1987, 33 (10) : 1333 - 1347
  • [6] A model for planning the product portfolio and launch timings under resource constraints
    Dash, Binay
    Gajanand, M. S.
    Narendran, T. T.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (15) : 5081 - 5103
  • [7] Scheduling multi-objective enterprise resource planning implementation projects under human resource constraints and uncertainty
    Subulan, Kemal
    JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY, 2020, 35 (03): : 1469 - 1485
  • [8] An efficient production planning approach based demand driven MRP under resource constraints
    Xu, Guangyan
    Guan, Zailin
    Yue, Lei
    Mumtaz, Jabir
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2023, 14 (03) : 451 - 466
  • [9] An Integrated Framework for Risk Response Planning Under Resource Constraints in Large Engineering Projects
    Fang, Chao
    Marle, Franck
    Xie, Min
    Zio, Enrico
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2013, 60 (03) : 627 - 639
  • [10] Distributed Optimization of Energy Portfolio and Production Planning for Multiple Companies Under Resource Constraints
    Nishi, T.
    Sekiya, E.
    Yin, S.
    45TH CIRP CONFERENCE ON MANUFACTURING SYSTEMS 2012, 2012, 3 : 275 - 280