A connector-based approach to the modular formulation problem for a mechanical product

被引:16
作者
Tseng, HE [1 ]
Chang, TS [1 ]
Yang, YC [1 ]
机构
[1] Da Yeh Univ, Dept Ind Engn, Changhua, Taiwan
关键词
connector; modular partition; product variety; connector-based assembly element; connector-based assembly sequence graph; gravitational centre;
D O I
10.1007/s00170-003-1656-4
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
To respond to marketing competition, companies strive to provide a large variety of products to meet consumers' requirements. With more choices in products, such variety brings the company closer to the consumers. However, manufacturers are facing a new challenge. The assembly and partitioning of components and subassembly are becoming increasingly more complicated, which cause not only a proliferation of subassemblies but also increases the difficulty in manufacturing. To solve this problem, modular design is a key issue. This study presents a methodology for the formulation of modules on the basis of the connector concept. Based on the information entry in the assembly network sequence proposed by Tseng and Li [12], a modular partition based on the connector concept is explored. Moreover, the problem of assigning components after partitioning and the evaluation of the partitioning results are discussed. In this study, the definition and representation of connectors are described first. Then, the algorithm for the formulation of modules is discussed. Finally, a case study with a detailed analysis is provided to illustrate the application of the proposed methodology.
引用
收藏
页码:161 / 171
页数:11
相关论文
共 15 条
[1]   THE METHOD OF ANALYSIS OF ASSEMBLY WORK BASED ON THE FASTENER METHOD [J].
AKAGI, F ;
OSAKI, H ;
KIKUCHI, S .
BULLETIN OF THE JSME-JAPAN SOCIETY OF MECHANICAL ENGINEERS, 1980, 23 (184) :1670-1675
[2]  
[Anonymous], 2001, PRODUCT DESIGN
[3]   AN INTEGRATED COMPUTER AID FOR GENERATING AND EVALUATING ASSEMBLY SEQUENCES FOR MECHANICAL PRODUCTS [J].
BALDWIN, DF ;
ABELL, TE ;
LUI, MCM ;
DEFAZIO, TL ;
WHITNEY, DE .
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1991, 7 (01) :78-94
[4]   An approach for estimating the end-of-life product disassembly effort and cost [J].
Das, SK ;
Yedlarajiah, P ;
Narendra, R .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (03) :657-673
[5]   SIMPLIFIED GENERATION OF ALL MECHANICAL ASSEMBLY SEQUENCES [J].
DEFAZIO, TL ;
WHITNEY, DE .
IEEE JOURNAL OF ROBOTICS AND AUTOMATION, 1987, 3 (06) :640-658
[6]  
GONGOR A, 1997, COMPUTER IND ENG, V33, P329
[7]   CAD-DIRECTED AUTOMATIC ASSEMBLY SEQUENCE PLANNING [J].
GU, P ;
YAN, X .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1995, 33 (11) :3069-3100
[8]   Product modularization for life cycle engineering [J].
Gu, P ;
Sosale, S .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 1999, 15 (05) :387-401
[9]   FUNCTIONAL UNDERSTANDING OF ASSEMBLY MODELING [J].
GUI, JK ;
MANTYLA, M .
COMPUTER-AIDED DESIGN, 1994, 26 (06) :435-451
[10]   Performance analysis of modular products [J].
He, DW ;
Kusiak, A .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (01) :253-272