共 50 条
- [1] Active settlement control with compensation grouting - Results from a case study GROUTING AND GROUND TREATMENT, VOL 2, PROCEEDINGS, 2003, (120): : 813 - 823
- [2] Settlement behaviour after compensation and corrective grouting GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 7TH INTERNATIONAL SYMPOSIUM, 2012, : 955 - 961
- [3] Calculation of the foundation settlement during compensation grouting XXII INTERNATIONAL SCIENTIFIC CONFERENCE: CONSTRUCTION THE FORMATION OF LIVING ENVIRONMENT (FORM-2019), 2019, 97
- [4] Construction of low-level tunnels below Waterloo Station with compensation grouting for the Jubilee Line Extension GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 1996, : 361 - 366
- [7] Geotechnical aspects of the Jubilee Line Extension, London GEOTECHNICAL ENGINEERING FOR TRANSPORTATION INFRASTRUCTURE, VOLS 1-3: THEORY AND PRACTICE, PLANNING AND DESIGN, CONSTRUCTION AND MAINTENANCE, 1999, : 1653 - 1664
- [8] London Bridge Station, Jubilee Line Extension 1997 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 1997, : 631 - 654
- [9] Compensation Grouting Program to Mitigate Settlement of Utilities from Tunneling IFCEE 2018: DEVELOPMENTS IN EARTH RETENTION, SUPPORT SYSTEMS, AND TUNNELING, 2018, (297): : 189 - 200
- [10] Southwark Underground Station, Jubilee Line Extension, London Concrete (London), 2000, 34 (09):