Production Scheduling based on Tabu and Scatter Search Techniques with an Heuristic Approach

被引:0
|
作者
Savino, Matteo Mario [1 ]
机构
[1] Univ Sannio, Dept Engn, I-82100 Benevento, Italy
关键词
Scheduling; Tabu Search; Work in Process; Heuristics;
D O I
10.1109/ICARCV.2008.4795643
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In this paper a two-stage decisions approach is proposed. In the first stage the production cycle is analysed in order to model it and to identify its constraints, while in the second one a feasible set of scenarios is generated. The core procedure is based on Tabu Search and Scatter Search methodologies, with which a population of paths evolves until a criteria is satisfied, yielding the best path. Using the first one the production cycle is analysed in order to model it and to identify its constraints while, using the second one a feasible set of scenarios is generated to introduce the dependencies between activities.
引用
收藏
页码:934 / 938
页数:5
相关论文
共 50 条
  • [1] A tabu search heuristic for scheduling the production processes at an oil refinery
    Persson, JA
    Göthe-Lundgren, M
    Lundgren, JT
    Gendron, B
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2004, 42 (03) : 445 - 471
  • [2] A tabu search heuristic for ship routing and scheduling
    Korsvik, J. E.
    Fagerholt, K.
    Laporte, G.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2010, 61 (04) : 594 - 603
  • [3] A tabu search heuristic for preventive maintenance scheduling
    Gopalakrishnan, M
    Mohan, S
    He, Z
    COMPUTERS & INDUSTRIAL ENGINEERING, 2001, 40 (1-2) : 149 - 160
  • [4] A tabu search heuristic for the quay crane scheduling problem
    Sammarra, Marcello
    Cordeau, Jean-Francois
    Laporte, Gilbert
    Monaco, M. Flavia
    JOURNAL OF SCHEDULING, 2007, 10 (4-5) : 327 - 336
  • [5] A tabu search heuristic for the quay crane scheduling problem
    Marcello Sammarra
    Jean-François Cordeau
    Gilbert Laporte
    M. Flavia Monaco
    Journal of Scheduling, 2007, 10 : 327 - 336
  • [6] Agent-based hybrid tabu-search heuristic for dynamic scheduling
    Firme, Bernardo
    Figueiredo, Joao
    Sousa, Joao M. C.
    Vieira, Susana M.
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2023, 126
  • [7] Combining tabu search and genetic algorithm heuristic techniques to solve spatial harvest scheduling problems
    Boston, K
    Bettinger, P
    FOREST SCIENCE, 2002, 48 (01) : 35 - 46
  • [8] A tabu search approach to machine scheduling
    Valls, V
    Perez, MA
    Quintanilla, MS
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 106 (2-3) : 277 - 300
  • [9] The hot strip mill production scheduling problem: A tabu search approach
    Lopez, L
    Carter, MW
    Gendreau, M
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 106 (2-3) : 317 - 335
  • [10] A Tabu Search Based Heuristic Approach for the Dynamic Container Relocation Problem
    Karpuzoglu, Osman
    Akyuz, M. Hakan
    Oncan, Temel
    OPERATIONS RESEARCH PROCEEDINGS 2015, 2017, : 165 - 171