Bi-stakeholder Conflict Resolution-Based Layout of Construction Temporary Facilities in Large-Scale Construction Projects

被引:7
|
作者
Song, Xiaoling [1 ,2 ]
Zhang, Zhe [1 ]
Xu, Jiuping [3 ]
Zeng, Ziqiang [4 ,5 ]
Shen, Charles [2 ]
Pea-Mora, Feniosky [2 ]
机构
[1] Nanjing Univ Sci & Technol, Dept Management Sci & Engn, Nanjing 210094, Jiangsu, Peoples R China
[2] Columbia Univ, Dept Civil Engn & Engn Mech, Adv ConsTruct & InfOrmat TechNol ACT Lab, New York, NY 10027 USA
[3] Sichuan Univ, State Key Lab Hydraul & Mt River Engn, Chengdu 610064, Sichuan, Peoples R China
[4] Sichuan Univ, Business Sch, Chengdu 610064, Sichuan, Peoples R China
[5] Univ Washington, Dept Civil & Environm Engn, Seattle, WA 98195 USA
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
Layout of CTFs; Material purchase; Layout planner; Stakeholder; Conflict resolution; GENETIC-ALGORITHMS; PROGRAMMING-MODEL; DECISION-MAKING; SYSTEM; OPTIMIZATION; SIZE;
D O I
10.1007/s40999-017-0233-4
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Planning a layout of construction temporary facilities (CTFs), a specific construction site layout problem, is crucial to the successful completion of large-scale construction projects. Despite considerable research undertaken, mutual relationships and conflicts between the layout planner and other pre-planning task stakeholders (i.e., for the scheduling of construction activities or the material purchase) are not yet addressed in the layout process. Resolving conflicts is crucial to the layout optimization and this study is among the first to plan appropriate CTF layouts by taking bi-stakeholder conflict resolution into account. A new bi-level mathematical method is developed based on the resolution of conflicts between the CTF layout planner and the material purchase stakeholder, and thus providing an example for future layouts with bi-stakeholder conflicts. In this method, a bi-level programming model is first established to model layout-related goals, constraints, and conflicts. Second, a bi-level genetic algorithm is proposed to solve the model for appropriate layouts. To demonstrate the applicability of the proposed method, the method is applied to design a CTF layout for the construction of a practical dam project. The results demonstrated that an appropriate layout and a satisfactory purchase plan were determined, and conflicts between the CTF layout and the material purchase were prevented. The contributions of the method are the ability to capture the mutual conflicts of the CTF layout and the material purchase in the bi-level model, the capacity to develop a more efficient and realistic layout, and the practicality to guide planners in other situations.
引用
收藏
页码:941 / 964
页数:24
相关论文
共 50 条
  • [1] Bi-stakeholder Conflict Resolution-Based Layout of Construction Temporary Facilities in Large-Scale Construction Projects
    Xiaoling Song
    Zhe Zhang
    Jiuping Xu
    Ziqiang Zeng
    Charles Shen
    Feniosky Peña-Mora
    International Journal of Civil Engineering, 2018, 16 : 941 - 964
  • [2] Conflicts resolution based construction temporary facilities layout planning in large-scale construction projects
    Song, Xiaoling
    Xu, Jiuping
    Shen, Charles
    Pena-Mora, Feniosky
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2016, 43 (09) : 783 - 801
  • [3] Suggestions for Temporary Construction Facilities' Layout Problems in Large-Scale Construction Projects
    Xu, Jiuping
    Song, Xiaoling
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (05)
  • [4] A Decision Making System for Construction Temporary Facilities Layout Planning in Large-Scale Construction Projects
    Xiaoling Song
    Jiuping Xu
    Charles Shen
    Feniosky Peña-Mora
    Ziqiang Zeng
    International Journal of Civil Engineering, 2017, 15 : 333 - 353
  • [5] A Decision Making System for Construction Temporary Facilities Layout Planning in Large-Scale Construction Projects
    Song, Xiaoling
    Xu, Jiuping
    Shen, Charles
    Pena-Mora, Feniosky
    Zeng, Ziqiang
    INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2017, 15 (2A) : 333 - 353
  • [6] Conflict resolution-motivated strategy towards integrated construction site layout and material logistics planning: A bi-stakeholder perspective
    Song, Xiaoling
    Xu, Jiuping
    Shen, Charles
    Pena-Mora, Feniosky
    AUTOMATION IN CONSTRUCTION, 2018, 87 : 138 - 157
  • [7] Resource Conflict Identification-Resolution-Based Construction Temporary Facilities Layout Framework in a Dam Construction Project
    Song, Xiaoling
    Qiu, Rui
    Shen, Charles
    Pena-Mora, Feniosky
    PROCEEDINGS OF THE TENTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2017, 502 : 1427 - 1437
  • [8] Multistakeholder Conflict Minimization-Based Layout Planning of Construction Temporary Facilities
    Song, Xiaoling
    Zhong, Lin
    Zhang, Zhe
    Xu, Jiuping
    Shen, Charles
    Pena-Mora, Feniosky
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2018, 32 (02)
  • [9] Dynamic conflict management in large-scale design and construction projects
    Ng, Helen S.
    Pena-Mora, Feniosky
    Tamaki, Tadatsugu
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2007, 23 (02) : 52 - 66
  • [10] Emergency Management of Large-Scale Construction Projects Based on Metadata
    Xu, Shengdeng
    PROCEEDINGS OF THE 6TH INTERNATIONAL ASIA CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION, VOL 2: INNOVATION AND PRACTICE OF INDUSTRIAL ENGINEERING AND MANAGMENT, 2016, : 865 - 875