共 50 条
- [3] Integrated Optimal Algorithm for Flexible Job Shop Scheduling with Due-date Window PROCEEDINGS OF THE 10TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA 2012), 2012, : 638 - 642
- [5] A due-date oriented scheduling heuristic for job shop cellular manufacturing system INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2000, 7 (01): : 76 - 88
- [6] Due-date oriented scheduling heuristic for job shop cellular manufacturing system International Journal of Industrial Engineering : Theory Applications and Practice, 2000, 7 (01): : 76 - 88
- [9] A Modified Genetic Algorithm to Due Date of Job Shop Scheduling Problem 2009 INTERNATIONAL SYMPOSIUM ON COMPUTER NETWORK AND MULTIMEDIA TECHNOLOGY (CNMT 2009), VOLUMES 1 AND 2, 2009, : 425 - +
- [10] An iterative algorithm for job shop scheduling based on adjusting due date Proceedings of the 24th Chinese Control Conference, Vols 1 and 2, 2005, : 1214 - 1217