An enhanced Borg algorithmic framework for solving the hydro-thermal-wind Co-scheduling problem

被引:17
|
作者
Ji, Bin [1 ]
Zhang, Binqiao [2 ,3 ]
Yu, Samson S. [4 ]
Zhang, Dezhi [1 ]
Yuan, Xiaohui [5 ]
机构
[1] Cent South Univ, Sch Traff & Transportat Engn, Changsha 410075, Peoples R China
[2] China Three Gorges Univ, Hubei Prov Key Lab Operat & Control Cascaded Hydr, Yichang 443002, Peoples R China
[3] China Three Gorges Univ, Coll Elect Engn & New Energy, Yichang 443002, Peoples R China
[4] Deakin Univ, Sch Engn, Waurn Ponds, Vic 3216, Australia
[5] Huazhong Univ Sci & Technol, Sch Hydropower & Informat Engn, Wuhan 430074, Peoples R China
基金
中国国家自然科学基金;
关键词
Hydro-thermal-wind system; Multi-objective optimization; Enhanced Borg algorithm; Constraint-handling; GRAVITATIONAL SEARCH ALGORITHM; MULTIOBJECTIVE EVOLUTIONARY ALGORITHMS; ECONOMIC-DISPATCH; UNIT COMMITMENT; POWER; OPTIMIZATION; TERM; COORDINATION; UNCERTAINTY; SYSTEM;
D O I
10.1016/j.energy.2020.119512
中图分类号
O414.1 [热力学];
学科分类号
摘要
An enhanced Borg (EBorg) algorithm has been proposed to solve the dual-objective short-term hydrothermal-wind co-scheduling (HTW-CS) problem, aiming at minimizing the cost and emissions associated with electric power generation while satisfying various hydraulic and electric constraints. The sophisticatedly designed evolution framework of the EBorg consists of i) e-dominance-based archive, ii) Pareto-dominance and crowding-distance-based population updating mechanism and iii) auto-adaptive multi-operator recombination, which guarantees the convergence capability and diversity and can avoid blindness selection of recombination operators. Meanwhile, a randomness-priority-based repairing constraint handling technique (CHT) is developed, and the performances of another two popular existing CHTs incorporated in the proposed search framework are compared and discussed. The proposed approaches are tested on the widely used HTW-CS case studies, and the results show that the proposed EBorg can achieve a decrease of cost and emissions compared with the existing methods. Additionally, energy performance in the case studies has shown an average 50% decrease of emissions with wind power integration, while the total cost is largely dependent on the cost coefficients related to wind uncertainty. Varying wind power cost coefficients and water inflow levels will result in different wind power and hydropower integration. (C) 2020 Elsevier Ltd. All rights reserved.
引用
收藏
页数:20
相关论文
共 24 条
  • [1] A Multi-objective Constraint-handling based Approach for Short-term Hydro-thermal-wind Co-scheduling Problem
    Ji, Bin
    Yu, Samson S.
    Su, Zikang
    IECON 2020: THE 46TH ANNUAL CONFERENCE OF THE IEEE INDUSTRIAL ELECTRONICS SOCIETY, 2020, : 1507 - 1512
  • [2] Optimal dispatch using moth-flame optimization for hydro-thermal-wind scheduling problem
    Hazra, Sunanda
    Roy, Provas Kumar
    INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2020, 30 (08):
  • [3] A Binary Borg-Based Heuristic Method for Solving a Multi-Objective Lock and Transshipment Co-Scheduling Problem
    Ji, Bin
    Yuan, Xiaohui
    Yuan, Yanbin
    IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2019, 20 (03) : 947 - 958
  • [4] Multi-Objective Optimal Scheduling for Hydro-Thermal-Wind Power System
    Han Zhonghui
    Cheng Tao
    Zhou Yifan
    Zhang Peng
    TENCON 2015 - 2015 IEEE REGION 10 CONFERENCE, 2015,
  • [5] Short-Term Hydro-Thermal-Wind Scheduling Using Salp Swarm Algorithm
    Das, Sujay
    Bhattacharya, Aniruddha
    Chakraborty, Ajoy Kumar
    2018 6TH INTERNATIONAL ELECTRICAL ENGINEERING CONGRESS (IEECON), 2018,
  • [6] Hydro-Thermal-Wind Generation Scheduling Considering Economic and Environmental Factors Using Heuristic Algorithms
    Damodaran, Suresh K.
    Kumar, T. K. Sunil
    ENERGIES, 2018, 11 (02)
  • [7] Hydro-thermal-wind scheduling employing novel ant lion optimization technique with composite ranking index
    Dubey, Hari Mohan
    Pandit, Manjaree
    Panigrahi, B. K.
    RENEWABLE ENERGY, 2016, 99 : 18 - 34
  • [8] An extended NSGA-III for solution multi-objective hydro-thermal-wind scheduling considering wind power cost
    Yuan, Xiaohui
    Tian, Hao
    Yuan, Yanbin
    Huang, Yuehua
    Ikram, Rana M.
    ENERGY CONVERSION AND MANAGEMENT, 2015, 96 : 568 - 578
  • [9] Power flow based hydro-thermal-wind scheduling of hybrid power system using sine cosine algorithm
    Dasgupta, Koustav
    Roy, Provas Kumar
    Mukherjee, Vivekananda
    ELECTRIC POWER SYSTEMS RESEARCH, 2020, 178
  • [10] Short-term hydro-thermal-wind complementary scheduling considering uncertainty of wind power using an enhanced multi-objective bee colony optimization algorithm
    Zhou, Jianzhong
    Lu, Peng
    Li, Yuanzheng
    Wang, Chao
    Yuan, Liu
    Mo, Li
    ENERGY CONVERSION AND MANAGEMENT, 2016, 123 : 116 - 129