Flowrate measurement of gas turbine cooling air at an advanced combined cycle power plant using the heater method for plant operation and maintenance

被引:1
|
作者
Umezawa, Shuichi [1 ]
Ohmori, Shuichi [1 ]
机构
[1] Tokyo Elect Power Co Holdings Inc, Tsurumi Ku, 4-1 Egasaki Cho, Yokohama, Kanagawa 2300002, Japan
来源
MECHANICAL ENGINEERING JOURNAL | 2022年 / 9卷 / 04期
关键词
Gas turbine; High temperature measurement; Flowmeter; Heat transfer; Clamp-on;
D O I
10.1299/mej.22-00030
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
At a combined cycle power plant, gas turbine cooling air flowrate data is required for operation and maintenance because it is an important for analyzing not only the temperature of both stators and blades but also plant efficiency. However, it is very difficult to measure the data. An ultrasonic flowmeter cannot be used since the measurement position becomes hot, usually exceeding 300 degrees centigrade. An insert type flowmeter is also difficult to use as it requires additional pipe processing for installation and also causes a pressure loss. Accordingly, we tried to use the heater method, which we proposed and validated in our previous papers. In this method, a circumferential heater is attached to the outside of a pipe and then the axial temperature distribution along the outside of the pipe, which is influenced by the fluid velocity in the pipe, is measured by thermocouples. The velocity is analyzed on the basis of the temperature distribution along the pipe. Measurements were conducted for two kinds of cooling air pipe at an advanced combined cycle power plant. In one, cooling air is extracted from the 13th stage of a compressor and supplied to the 2nd stators of the gas turbine; in the other, cooling air is extracted from the 9th stage of the compressor and supplied to the 3rd stators of the gas turbine. As a result, it was clarified that the cooling air flowrate had a positive dependence on atmospheric temperature at the plant. The dependence was also compared to that of a tit 1,600 degrees centigrade-class combined cycle power plant, with a power output of 700 MW.
引用
收藏
页数:10
相关论文
共 50 条
  • [1] Measurement of gas turbine cooling air flow rate at an advanced combined cycle power plant using the heater method for plant operation and maintenance
    Umezawa, Shuichi
    Ohmori, Shuichi
    Proceedings of the International Conference on Power Engineering 2021, ICOPE 2021, 2021,
  • [2] Analytical method for evaluation of gas turbine inlet air cooling in combined cycle power plant
    Yang, Cheng
    Yang, Zeliang
    Cai, Ruixian
    APPLIED ENERGY, 2009, 86 (06) : 848 - 856
  • [3] FEATURES OF OPERATION OF AIR HEATER IN A CLOSED-CYCLE GAS-TURBINE PLANT
    KAGANOVICH, SA
    PERMYAKOV, BA
    TOCHILGIN, IM
    SUKHOV, VI
    IVANOVA, TI
    THERMAL ENGINEERING, 1972, 19 (04) : 60 - 63
  • [4] Technical and economic evaluation of gas turbine inlet air cooling in a combined cycle power plant
    Tehrani, Seyed Saeed Mostafavi
    Avval, Majid Saffar
    Alvandifar, Negar
    Rabiei, Hossein
    2011 PROCEEDINGS OF THE 3RD CONFERENCE ON THERMAL POWER PLANTS (CTPP), 2011,
  • [5] TESTING AIR HEATER OF A CLOSED CYCLE GAS TURBINE PLANT
    KAGANOVI.SA
    TOCHILKI.IM
    PERMYAKO.BA
    IVANOVA, TI
    THERMAL ENGINEERING, 1969, 16 (04) : 28 - &
  • [6] THE EFFECT OF PARTIAL-LOAD OPERATION ON A GAS TURBINE COMPRESSOR OF AN ADVANCED COMBINED CYCLE POWER PLANT
    Hagita, Yasuharu
    Miyazawa, Hironori
    Furusawa, Takashi
    Yamamoto, Satoru
    Yonezawa, Koichi
    Umezawa, Shuichi
    Ohmori, Shuichi
    Suzuki, Takeshi
    PROCEEDINGS OF ASME TURBO EXPO 2022: TURBOMACHINERY TECHNICAL CONFERENCE AND EXPOSITION, GT2022, VOL 10D, 2022,
  • [7] Performance improvement of gas turbine combined cycle power plant by dual cooling of the inlet air and turbine coolant using an absorption chiller
    Kwon, Hyun Min
    Kim, Tong Seop
    Sohn, Jeong Lak
    Kang, Do Won
    ENERGY, 2018, 163 : 1050 - 1061
  • [8] Advanced gas turbine and high performance gas-steam combined cycle plant with blade cooling air controlling
    Tsuji, Tadashi
    Takagi, Toshimi
    Kinoshita, Shinichi
    Nippon Kikai Gakkai Ronbunshu, B Hen/Transactions of the Japan Society of Mechanical Engineers, Part B, 2002, 68 (672): : 2385 - 2392
  • [9] Advanced gas turbine and high performance gas-steam combined cycle plant with blade cooling air controlling
    Tsuji, Tadashi
    Proceedings of the ASME Turbo Expo 2006, Vol 4, 2006, : 219 - 227
  • [10] Optimum gas turbine cycle for combined cycle power plant
    Polyzakis, A. L.
    Koroneos, C.
    Xydis, G.
    ENERGY CONVERSION AND MANAGEMENT, 2008, 49 (04) : 551 - 563