Modular steel bridge speeds reopening of southbound I-95 in Connecticut

被引:0
|
作者
不详
机构
关键词
D O I
暂无
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
引用
收藏
页码:4 / 4
页数:1
相关论文
共 5 条
  • [1] Fatigue strength assessment of I-95 bridge over James River
    Massarelli, PJ
    Zhou, YE
    Gomez, JP
    STRUCTURAL ENGINEERING IN THE 21ST CENTURY, 1999, : 813 - 816
  • [3] Fracture analysis and retrofit design for the I-95 bridge over the Brandywine River
    Chajes, MJ
    Mertz, DR
    Roecker, H
    Milius, J
    RECENT DEVELOPMENTS IN BRIDGE ENGINEERING, 2003, : 205 - 220
  • [4] DISASTER OF THE I-95 MIANUS RIVER BRIDGE - WHERE COULD LATERAL VIBRATION COME FROM
    GORLOV, AM
    JOURNAL OF APPLIED MECHANICS-TRANSACTIONS OF THE ASME, 1984, 51 (03): : 694 - 696
  • [5] A Non-contact Method for Robotic Measurement of Warping in Steel Girders: Case Study of I-95 Overpass After Fire
    Alamdari, Ali Ghadimzadeh
    Ebrahimkhanlou, Arvin
    SENSORS AND SMART STRUCTURES TECHNOLOGIES FOR CIVIL, MECHANICAL, AND AEROSPACE SYSTEMS 2024, 2024, 12949