Time management in active networks

被引:0
|
作者
Lee, C [1 ]
Coe, E [1 ]
Clark, JM [1 ]
Stepanek, J [1 ]
Raghavendra, C [1 ]
Bellman, K [1 ]
机构
[1] Aerosp Corp, Comp Syst Res Dept, El Segundo, CA 90009 USA
关键词
D O I
10.1109/AMS.2001.993720
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
This paper investigates time management for distributed simulations in active networks. Time management is essentially the computation of the Lower Bound Time Stamp (LBTS) across federates in a distributed simulation, including in-transit (in-flight) messages. We show that the LBTS computation is an instance of the Distributed Termination Detection (DTD) problem and how DTD algorithms can be applied to LBTS in an active network. These algorithms are potentially much more efficient than traditional algorithms that rely on point-to-point communication. We demonstrate the potential of the Distinguished Root Node algorithm that can compute LBTS in O(logn) time in general network topologies using a prototype implemented in Java. While active network algorithms have the potential for improved functionality and superior performance, this potential will only be realized when "native" implementations are possible. For wide-scale deployment, real-world issues such as reliable delivery dynamic routing topologies, security and fault tolerance will have to be systematically addressed.
引用
收藏
页码:51 / 64
页数:14
相关论文
共 50 条
  • [1] OPF Techniques for Real-Time Active Management of Distribution Networks
    Robertson, James G.
    Harrison, Gareth P.
    Wallace, A. Robin
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2017, 32 (05) : 3529 - 3537
  • [2] Scalable time management algorithms using active networks for distributed simulation
    Lee, C
    Coe, E
    Clark, JM
    Stepanek, J
    Raghavendra, C
    Bhatia, S
    Puri, R
    DARPA ACTIVE NETWORKS CONFERENCE AND EXPOSITION, PROCEEDINGS, 2002, : 366 - 378
  • [3] Management of Active and Programmable Networks
    Stephen F. Bush
    Shivkumar Kalyanaraman
    Journal of Network and Systems Management, 2006, 14 : 1 - 5
  • [4] A management architecture for active networks
    Barone, A
    Chirco, P
    Di Fatta, G
    Lo Re, G
    FOURTH ANNUAL INTERNATIONAL WORKSHOP ON ACTIVE MIDDLEWARE SERVICES, PROCEEDINGS, 2002, : 41 - 48
  • [5] Management of active and programmable networks
    Bush, Stephen F.
    Kalyanaraman, Shivkumar
    JOURNAL OF NETWORK AND SYSTEMS MANAGEMENT, 2006, 14 (01) : 1 - 5
  • [6] Resource management in active networks
    Devi, KV
    Mehata, KM
    PDPTA '05: PROCEEDINGS OF THE 2005 INTERNATIONAL CONFERENCE ON PARALLEL AND DISTRIBUTED PROCESSING TECHNIQUES AND APPLICATIONS, VOLS 1-3, 2005, : 24 - 30
  • [7] Tutorial on active networks and their management
    Brunner, M
    ANNALES DES TELECOMMUNICATIONS-ANNALS OF TELECOMMUNICATIONS, 2002, 57 (5-6): : 480 - 501
  • [8] Active networks and its management
    Brunner, M
    ECUMN '2000: 1ST EUROPEAN CONFERENCE ON UNIVERSAL MULTISERVICE NETWORKS, PROCEEDINGS, 2000, : 414 - 424
  • [9] Resources Management in Active Networks
    WANG Jian-guo 1
    2.Institute of Computer Architecture & Network
    TheJournalofChinaUniversitiesofPostsandTelecommunications, 2003, (01) : 66 - 71
  • [10] Sustainable Management in Active Networks
    Ougolnitsky, Gennady
    Gorbaneva, Olga
    MATHEMATICS, 2022, 10 (16)