BIM-based collaboration - a phase-oriented process concept for virtual design reviews

被引:1
|
作者
Baumgaertel, Lukas [1 ]
Schoenbach, Robin [1 ]
Hartung, Robert [1 ]
Ruwoldt, Alexander [1 ]
Klemt-Albert, Katharina [1 ]
机构
[1] Leibniz Univ Hannover, Inst Baumanagement & Digitales Bauen, Appelstr 9a, D-30167 Hannover, Germany
关键词
building information modeling; BIM; design review; meeting concept; virtual design review; VDR; communication; digital collaboration;
D O I
10.1002/bate.202000098
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
BIM-based collaboration - a phase-oriented process concept for virtual design reviews Object-based, digital 3-D building models are used as a central source of information for all project participants when Building Information Modeling is applied and are thus increasingly becoming the focus of meetings in construction projects. However, there are hardly any orientations or standards for the implementation of virtual design reviews, which concern clear process structures, role distributions as well as basic IT requirements for the rooms of digital meetings. The potentials of model-based collaboration through the introduction of BIM therefore often remain unused. The present article takes up the process conditions of the BIM methodology and influencing variables of meeting processes, describes the implementation of virtual design reviews in three real projects and, as a result of the analysis of these three scenarios, shows a phase-oriented innovative process concept for the integral preparation, realisation and post-processing of a virtual design review, including a clear distribution of roles as well as recommendations on requirements for data management, room equipment and IT.
引用
收藏
页码:817 / 825
页数:9
相关论文
共 50 条
  • [1] Automated BIM-based process for wind engineering design collaboration
    Mohammad Delavar
    Girma T. Bitsuamlak
    John K. Dickinson
    Leandro Malveira F. Costa
    Building Simulation, 2020, 13 : 457 - 474
  • [2] Automated BIM-based process for wind engineering design collaboration
    Delavar, Mohammad
    Bitsuamlak, Girma T.
    Dickinson, John K.
    Costa, Leandro Malveira F.
    BUILDING SIMULATION, 2020, 13 (02) : 457 - 474
  • [3] BIM-Based Spatial Augmented Reality (SAR) for Architectural Design Collaboration: A Proof of Concept
    Jin, Yixuan
    Seo, JoonOh
    Lee, Jin Gang
    Ahn, Seungjun
    Han, SangUk
    APPLIED SCIENCES-BASEL, 2020, 10 (17):
  • [4] Design patterns for BIM-based service-oriented architectures
    Isikdag, Umit
    AUTOMATION IN CONSTRUCTION, 2012, 25 : 59 - 71
  • [5] PHASE-ORIENTED MODEL OF TECHNOLOGICAL TRANSFER PROCESS
    HELLMIG, G
    BETRIEBSWIRTSCHAFTLICHE FORSCHUNG UND PRAXIS, 1977, 29 (05): : 439 - 451
  • [6] User interface design based on phase-oriented information classification
    Mitsuda, N
    Ajisaka, T
    Sawada, A
    ELECTRONICS AND COMMUNICATIONS IN JAPAN PART III-FUNDAMENTAL ELECTRONIC SCIENCE, 2004, 87 (06): : 44 - 54
  • [7] BIM-based process management model for building design and refurbishment
    Ustinovichius, Leonas
    Popov, Vladimir
    Cepurnaite, Jovita
    Vilutiene, Tatjana
    Samofalov, Michail
    Miedzialowski, Czeslaw
    ARCHIVES OF CIVIL AND MECHANICAL ENGINEERING, 2018, 18 (04) : 1136 - 1149
  • [8] BIM-based Virtual Reality and Human Behavior Simulation For Safety Design
    Park, Hyejin
    Panya, David Stephen
    Goo, Hyungmo
    Kim, Teahoon
    Seo, Jihyo
    COMPUTING FOR A BETTER TOMORROW, (ECAADE 2018), VOL 2, 2018, : 823 - 832
  • [9] Developing a BIM-Based MUVR Treadmill System for Architectural Design Review and Collaboration
    Keung, Calvin Chung Wai
    Kim, Jung In
    Ong, Qiao Min
    APPLIED SCIENCES-BASEL, 2021, 11 (15):
  • [10] BIM-BASED FILE SYNCHRONISATION AND PERMISSION MANAGEMENT SYSTEM FOR ARCHITECTURAL DESIGN COLLABORATION
    Kim, Mikyoung
    Ji, Seungyeul
    Kim, Eonyong
    Jun, Han-Jong
    PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON COMPUTER-AIDED ARCHITECTURAL DESIGN RESEARCH IN ASIA (CAADRIA 2016): LIVING SYSTEMS AND MICRO-UTOPIAS: TOWARDS CONTINUOUS DESIGNING, 2016, : 467 - 476