A constraint generation approach for two-machine shop problems with jobs selection

被引:7
|
作者
Della Croce, Federico [1 ,2 ]
Koulamas, Christos [3 ]
T'kindt, Vincent [4 ]
机构
[1] Politecn Torino, DAI, Turin, Italy
[2] CNR, IEIIT, Turin, Italy
[3] Florida Int Univ, Coll Business, Miami, FL 33199 USA
[4] Univ Tours, CNRS, LI EA 6300, OC ERL 6305, Tours, France
关键词
Scheduling; Jobs selection; Two-machine shop problems; Constraint generation approach; SCHEDULING PROBLEM; FLOWSHOP;
D O I
10.1016/j.ejor.2016.11.036
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider job selection problems in two-stage flow shops and job shops. The aim is to select the best job subset with a given cardinality to minimize the makespan. These problems are known to be ordinary NP-hard and the current state of the art algorithms can solve flow shop problems with up to 3000 jobs. We introduce a constraint generation approach to the integer linear programming (ILP) formulation of these problems according to which the constraints associated with nearly all potential critical paths are relaxed and then only the ones violated by the relaxed solution are sequentially reinstated. The proposed approach is capable of solving problems with up to 100000 jobs. (C) 2016 Elsevier B.V. All rights reserved.
引用
收藏
页码:898 / 905
页数:8
相关论文
共 50 条
  • [1] Two-machine flow shop scheduling problems with no-wait jobs
    Bouquard, JL
    Billaut, JC
    Kubzin, MA
    Strusevich, VA
    OPERATIONS RESEARCH LETTERS, 2005, 33 (03) : 255 - 262
  • [2] A dynamic programming algorithm for scheduling jobs in a two-machine open shop with an availability constraint
    Lorigeon, T
    Billaut, JC
    Bouquard, JL
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2002, 53 (11) : 1239 - 1246
  • [3] An improved heuristic for two-machine flow shop scheduling with an availability constraint and nonresumable jobs
    Hatem Hadda
    Najoua Dridi
    Sonia Hajri-Gabouj
    4OR, 2010, 8 : 87 - 99
  • [4] An improved heuristic for two-machine flow shop scheduling with an availability constraint and nonresumable jobs
    Hadda, Hatem
    Dridi, Najoua
    Hajri-Gabouj, Sonia
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2010, 8 (01): : 87 - 99
  • [5] Transporting Jobs Through a Two-Machine Open Shop
    Lushchakova, Irina N.
    Soper, Alan J.
    Strusevich, Vitaly A.
    NAVAL RESEARCH LOGISTICS, 2009, 56 (01) : 1 - 18
  • [6] Two-machine open shop scheduling with an availability constraint
    Breit, J
    Schmidt, G
    Strusevich, VA
    OPERATIONS RESEARCH LETTERS, 2001, 29 (02) : 65 - 77
  • [7] Two-machine Shop Scheduling with Two Agents and Linear Deteriorating Jobs
    Zhao, Xiaoli
    Wang, Gongshu
    2015 27TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2015, : 1154 - 1159
  • [8] A two-machine flowshop scheduling problem with precedence constraint on two jobs
    Cheng, Shuenn-Ren
    Yin, Yunqiang
    Wen, Chih-Hou
    Lin, Win-Chin
    Wu, Chin-Chia
    Liu, Jun
    SOFT COMPUTING, 2017, 21 (08) : 2091 - 2103
  • [9] A two-machine flowshop scheduling problem with precedence constraint on two jobs
    Shuenn-Ren Cheng
    Yunqiang Yin
    Chih-Hou Wen
    Win-Chin Lin
    Chin-Chia Wu
    Jun Liu
    Soft Computing, 2017, 21 : 2091 - 2103
  • [10] Minimizing the weighted number of tardy jobs on a two-machine flow shop
    Bulfin, RL
    M'Hallah, R
    COMPUTERS & OPERATIONS RESEARCH, 2003, 30 (12) : 1887 - 1900