共 50 条
- [1] Analyzing and Processing the Malfunction of Control Valve Dithering in PWR Nuclear Power Plant NUCLEAR POWER PLANTS: INNOVATIVE TECHNOLOGIES FOR INSTRUMENTATION AND CONTROL SYSTEMS, 2017, 400 : 59 - 68
- [2] Improvement and optimization of master/bypass valve switching process for steam generator level control of nuclear power plant Yuanzineng Kexue Jishu/Atomic Energy Science and Technology, 2015, 49 (03): : 523 - 528
- [3] SEISMIC TEST RESULT OF MOTOR-OPERATED VALVE ACTUATORS FOR NUCLEAR POWER PLANT PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE, 2017, VOL 8, 2017,
- [4] SEISMIC TEST RESULT (STATIC LOAD TEST) OF THE DYNAMIC FUNCTIONAL DEMAND VALVE FOR NUCLEAR POWER PLANT PROCEEDINGS OF ASME 2022 PRESSURE VESSELS AND PIPING CONFERENCE, PVP2022, VOL 5, 2022,
- [5] Optimization Research on Overall Test Strategy of Operational DCS in Nuclear Power Plant 2018 INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY (POWERCON), 2018, : 4655 - 4660
- [6] SEISMIC TEST RESULT OF MOTOR-OPERATED BUTTERFLY VALVE ACTUATORS FOR NUCLEAR POWER PLANT PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE, 2018, VOL 8, 2019,
- [7] SEISMIC TEST ANALYSIS EVALUATION OF MOTOR-OPERATED VALVE ACTUATORS FOR NUCLEAR POWER PLANT PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE, 2018, VOL 8, 2019,
- [10] Schedule optimization for nuclear power plant periodic maintenance Hedongli Gongcheng, 2008, 3 (104-107): : 104 - 107