Approximation algorithms for multi-agent scheduling to minimize total weighted completion time

被引:86
|
作者
Lee, Kangbok [2 ]
Choi, Byung-Cheon [2 ]
Leung, Joseph Y. -T. [1 ]
Pinedo, Michael L. [2 ]
机构
[1] New Jersey Inst Technol, Dept Comp Sci, Newark, NJ 07102 USA
[2] NYU, Dept Informat Operat & Management Sci, Stern Sch Business, New York, NY 10012 USA
关键词
Multi-agent scheduling; Total weighted completion time; Approximation algorithm; FPTAS; Multi-Objective Shortest-Path problem; OBJECTIVES;
D O I
10.1016/j.ipl.2009.04.018
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
We consider a multi-agent scheduling problem on a single machine in which each agent is responsible for his own set of jobs and wishes to minimize the total weighted completion time of his own set of jobs. It is known that the unweighted problem with two agents is NP-hard in the ordinary sense. For this case, we can reduce our problem to a Multi-Objective Shortest-Path (MOSP) problem and this reduction leads to several results including Fully Polynomial Time Approximation Schemes (FPTAS). We also provide an efficient approximation algorithm with a reasonably good worst-case ratio. (C) 2009 Elsevier B.V. All rights reserved.
引用
收藏
页码:913 / 917
页数:5
相关论文
共 50 条
  • [1] Approximation Algorithms for Multiprocessor Scheduling with Testing to Minimize the Total Job Completion Time
    Gong, Mingyang
    Chen, Zhi-Zhong
    Hayashi, Kuniteru
    ALGORITHMICA, 2024, 86 (05) : 1400 - 1427
  • [2] Approximation Algorithms for Multiprocessor Scheduling with Testing to Minimize the Total Job Completion Time
    Mingyang Gong
    Zhi-Zhong Chen
    Kuniteru Hayashi
    Algorithmica, 2024, 86 : 1400 - 1427
  • [3] Scheduling with Rejection to Minimize the Total Weighted Completion Time
    Zhang, Shu-Xia
    Cao, Zhi-Gang
    Zhang, Yu-Zhong
    OPERATIONS RESEARCH AND ITS APPLICATIONS, PROCEEDINGS, 2009, 10 : 111 - +
  • [4] Customer order scheduling to minimize total weighted completion time
    Wang, Guoqing
    Cheng, T. C. Edwin
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2007, 35 (05): : 623 - 626
  • [5] A flowshop scheduling algorithm to minimize total weighted completion time
    Zhao, CL
    Zhang, QL
    Tang, HY
    PROCEEDINGS OF THE 4TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-4, 2002, : 1485 - 1488
  • [6] Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs
    Cheng, T. C. E.
    Ng, C. T.
    Yuan, J. J.
    THEORETICAL COMPUTER SCIENCE, 2006, 362 (1-3) : 273 - 281
  • [7] Open shop scheduling problem to minimize total weighted completion time
    Bai, Danyu
    Zhang, Zhihai
    Zhang, Qiang
    Tang, Mengqian
    ENGINEERING OPTIMIZATION, 2017, 49 (01) : 98 - 112
  • [8] Online scheduling of a single machine to minimize total weighted completion time
    Anderson, EJ
    Potts, CN
    MATHEMATICS OF OPERATIONS RESEARCH, 2004, 29 (03) : 686 - 697
  • [9] Scheduling Coflows of Multi-stage Jobs to Minimize the Total Weighted Job Completion Time
    Tian, Bingchuan
    Tian, Chen
    Dai, Haipeng
    Wang, Bingquan
    IEEE CONFERENCE ON COMPUTER COMMUNICATIONS (IEEE INFOCOM 2018), 2018, : 864 - 872
  • [10] Scheduling a maintenance activity to minimize total weighted completion-time
    Mosheiov, Gur
    Sarig, Assaf
    COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2009, 57 (04) : 619 - 623