A joint internal production and external supplier order lot size optimization under defective manufacturing and rework

被引:11
|
作者
Mokhtari, Hadi [1 ]
机构
[1] Univ Kashan, Dept Ind Engn, Fac Engn, Kashan, Iran
来源
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY | 2018年 / 95卷 / 1-4期
关键词
Manufacturing planning; Joint lot sizing problem; Production-inventory system; Defective process; PRODUCTION QUANTITY MODEL; IMPERFECT QUALITY; PRODUCTION SYSTEM; BATCH SIZE; INVENTORY; IMPROVEMENT; SHORTAGE; TIME;
D O I
10.1007/s00170-017-1290-1
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The traditional production-inventory problems do not consider joint production and order lot sizes in manufacturing systems. This paper considers a defective system to jointly decide on order and production lot sizes in a manufacturing company. The manufacturer produces items with finite processing rate where a percentage of these items are of imperfect quality. At the end of production process, the rework of imperfect items is carried out. The demand rate and the number of defective items are considered to be uncertain parameters. The aim is to determine optimal number of sub-production cycles, as well as optimal order quantity. To address this problem, we first define the problem and describe its characteristics, build the model via deriving total cost function, design an appropriate solution algorithm, and then illustrate and evaluate the results. The solution algorithm is based on an ant colony optimization (ACO) which is enhanced by an adaptive learning strategy. A numerical example is presented and discussed, and the results are compared with basic ACO and genetic algorithm (GA). Finally, sensitivity analysis and robustness analysis are performed and discussed. The observed results reveal the robust performance of proposed approach against basic ACO and GA. Moreover, we observed that the performance of basic ACO and GA is approximately the same, and the basic ACO is more robust than GA in our experiments.
引用
收藏
页码:1039 / 1058
页数:20
相关论文
共 23 条
  • [1] A joint internal production and external supplier order lot size optimization under defective manufacturing and rework
    Hadi Mokhtari
    The International Journal of Advanced Manufacturing Technology, 2018, 95 : 1039 - 1058
  • [2] A joint internal production and external supplier order lot size optimization under defective manufacturing and rework
    Mokhtari, Hadi (mokhtari_ie@kashanu.ac.ir), 1600, Springer London (95): : 1 - 4
  • [3] An economic production lot size model for defective items with stochastic demand, backlogging and rework
    Das Roy, Monami
    Sana, Shib Sankar
    Chaudhuri, Kripasindhu
    IMA JOURNAL OF MANAGEMENT MATHEMATICS, 2014, 25 (02) : 159 - 183
  • [4] Joint determination of the production lot size and number of shipments for epq model with rework
    Chiu, Singa Wang
    Gong, Dah-Chuan
    Chiu, Chun-Lin
    Chung, Chia-Ling
    Mathematical and Computational Applications, 2011, 16 (02) : 317 - 328
  • [6] Optimal manufacturing lot size for a single-stage production system with rework in a fuzzy environment
    Shekarian, Ehsan
    Glock, Christoph H.
    Amiri, Seyyed Mehrdad Pourmousavi
    Schwindl, Kurt
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2014, 27 (06) : 3067 - 3080
  • [7] A model on determining the logistics lot-size of supplier under make-to-order
    Ye, TF
    Han, WM
    PROCEEDINGS OF THE 2005 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (12TH), VOLS 1- 3, 2005, : 784 - 788
  • [8] Transient performance analysis and optimization of multi-rework production systems with small-lot order
    Jia, Zhi-Yang
    Ni, Ze-Jun
    Wang, Zun-Jun
    Wang, Gang
    Kongzhi yu Juece/Control and Decision, 2024, 39 (08): : 2746 - 2754
  • [9] Joint lot-size and preventive maintenance optimization for a production system
    Liu, Xuejuan
    Wang, Wenbin
    Zhao, Fei
    Peng, Rui
    International Journal of Performability Engineering, 2015, 11 (01) : 91 - 96
  • [10] Determining an optimal replenishment run time and lot size for an imperfect manufacturing system and rework under markdown policy
    Sekar, T.
    Uthayakumar, R.
    JOURNAL OF ANALYSIS, 2019, 27 (02): : 493 - 514