Prioritizing Project Interdependent Risks: A Network-based Approach

被引:0
|
作者
Guan, L. [1 ]
Abbasi, A. [1 ]
Ryan, M. J. [2 ]
机构
[1] Univ New South Wales, Sch Engn & Informat Technol, Canberra, ACT, Australia
[2] Capabil Associates, Canberra, ACT, Australia
关键词
Risk interdependencies; risk management; risk structure matrix; social network analysis; risk indicators; MODEL;
D O I
10.1109/IEEM50564.2021.9673060
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Projects are usually exposed to numerous and interdependent risks both internally and externally, making the project risk management process essential to the successful realization of project objectives. Instead of analyzing project risks individually, this paper presents a network-based approach to capturing complex risk interdependencies while prioritizing project risks, which is grounded in the theoretical framework of social network analysis and considers two typical dimensions (i.e., risk occurrence probability, and risk impact) of risk modeling. The concept of the design structure matrix is used to facilitate the establishment of a project risk interdependency network. Five risk indicators (e.g., risk degree centrality, risk betweenness centrality, risk closeness centrality, risk local influence, and risk global influence) are tailored and proposed to prioritize project risks, which can provide project decision makers with a more comprehensive understanding of the project risk profile. Appropriate risk mitigation actions can then be formulated to mainly control critical project risks. An application example is presented to illustrate the utility and validity of the proposed approach.
引用
收藏
页码:1513 / 1517
页数:5
相关论文
共 50 条
  • [1] Constructing Interdependent Risks Network of Project Portfolio Based on Bayesian Network
    Guan Du-juan
    Guo Peng
    2014 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (ICMSE), 2014, : 1587 - 1592
  • [2] A systematic network-based approach to prioritizing IncRNA drivers in cancers
    Li, Jun
    Zhou, Zhicheng
    Liang, Han
    CANCER RESEARCH, 2016, 76
  • [3] Correction to: Prioritizing interdependent drivers of financial, economic, and political risks using a data‑driven probabilistic approach
    Abroon Qazi
    Mecit Can Emre Simsekler
    Risk Management, 2022, 24 : 186 - 186
  • [4] Network-based project planning and scheduling
    Khamooshi, H
    INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 1996, 96 (08) : 13 - &
  • [5] Network-based project planning and scheduling
    Nene Coll of Higher Education, Northampton, United Kingdom
    Ind Manage Data Sys, 8 (13-22):
  • [6] Prioritizing Risks in Last Mile Delivery: A Bayesian Belief Network Approach
    Mismar, Hajed
    Shamayleh, Abdulrahim
    Qazi, Abroon
    IEEE ACCESS, 2022, 10 : 118551 - 118562
  • [7] GenePANDA—a novel network-based gene prioritizing tool for complex diseases
    Tianshu Yin
    Shu Chen
    Xiaohui Wu
    Weidong Tian
    Scientific Reports, 7
  • [8] A network-based method for visual identification of systemic risks
    Soramaki, Kimmo
    Cook, Samantha
    Laubsch, Alan
    JOURNAL OF NETWORK THEORY IN FINANCE, 2016, 2 (01): : 67 - 101
  • [9] Automated Generation of Work Breakdown Structure and Project Network Model for Earthworks Project Planning: A Flow Network-Based Optimization Approach
    Li, Duanshun
    Lu, Ming
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (01)
  • [10] Interdependent Attribute Interference Fuzzy Neural Network-Based Alzheimer Disease Evaluation
    Ahmed S.T.
    Koti M.S.
    Muthukumaran V.
    Joseph R.B.
    Satheesh K.S.
    International Journal of Fuzzy System Applications, 2022, 11 (03) : 1 - 13