BIM to field: Robotic total station and BIM for quality control

被引:0
|
作者
Kang, J. [1 ]
Ganapathi, A. [1 ]
Lee, J. [1 ]
Faghihi, V. [1 ]
机构
[1] Texas A&M Univ, College Stn, TX 77843 USA
关键词
D O I
暂无
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
One of the reasons why some construction professionals are excited about BIM is because of its ability to visualize the installation of prefabricated building modules. As far as using BIM for facilitating the prefabrication process, we expect that all building components are installed correctly as indicated in the model. However, in many cases, building components such as cast-in-place concrete beams and columns are installed a little bit inaccurately because the formworks can be sagged or twisted while fresh concrete is being placed. Our research tested how effectively BIM and Robotic Total Station technology would facilitate to advance the quality control practices on field. For this investigation, we invited three Robotic Total Station technology venders to a 107,000-square-foot academic building construction project jobsite. Our test confirmed that the use Robotic Total Stations expedited the process of marking the layout points on the jobsite or collecting point data from existing facilities. Along with the results of our test, this paper also presents some lessons we learned from the field test.
引用
收藏
页码:717 / 722
页数:6
相关论文
共 50 条
  • [1] Embracing BIM in its totality: a Total BIM case study
    Disney, Oliver
    Roupe, Mattias
    Johansson, Mikael
    Leto, Alessio Domenico
    SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2024, 13 (03) : 512 - 531
  • [2] BIM quality control based on requirement linked data
    Kovacs, Adam Tamas
    Micsik, Andras
    INTERNATIONAL JOURNAL OF ARCHITECTURAL COMPUTING, 2021, 19 (03) : 431 - 448
  • [3] THE POSSIBILITIES OF BIM QUALITY CONTROL IN THE GAME DEVELOPMENT ENVIRONMENT
    Volarik, T.
    Kuruc, M.
    Kratochvil, R.
    Vystavel, O.
    MEASUREMENT, VISUALISATION AND PROCESSING IN BIM FOR DESIGN AND CONSTRUCTION MANAGEMENT II, 2022, 46-5 (W1): : 239 - 243
  • [4] BIM DATA: PROPOSED ELEMENTS OF QUALITY AND CONTROL METHOD
    Ariza Lopez, Francisco Javier
    Ariza Lopez, Inigo
    GEOFOCUS-REVISTA INTERNACIONAL DE CIENCIA Y TECNOLOGIA DE LA INFORMACION GEOGRAFICA, 2016, (17): : 66 - 92
  • [5] BIM Process Quality
    Bastert, Heinrich
    Meyer, Julian
    Orf, Matthias
    BETON- UND STAHLBETONBAU, 2022, 117 (05) : 357 - 365
  • [6] Application of BIM technology in refrigeration station design
    Zhang Yang
    Guo Xuefei
    Zhang Hongwei
    Wang Lanzhi
    Computer Aided Drafting,Design and Manufacturing, 2017, (01) : 63 - 67
  • [7] Information Exchange for Supporting BIM to Robotic Construction
    McClymonds, Austin
    Asadi, Somayeh
    Wagner, Alan
    Leicht, Robert M.
    CONSTRUCTION RESEARCH CONGRESS 2022: COMPUTER APPLICATIONS, AUTOMATION, AND DATA ANALYTICS, 2022, : 839 - 848
  • [8] A BIM-based framework for road construction quality control and quality assurance
    Han, Chengjia
    Han, Tao
    Ma, Tao
    Tong, Zheng
    Wang, Siqi
    INTERNATIONAL JOURNAL OF PAVEMENT ENGINEERING, 2023, 24 (01)
  • [9] Development of Quality Control Requirements for Improving the Quality of Architectural Design Based on BIM
    Choi, Jungsik
    Lee, Sejin
    Kim, Inhan
    APPLIED SCIENCES-BASEL, 2020, 10 (20): : 1 - 25
  • [10] Research on BIM technology application in the construction of a subway station
    Li, Yanfeng
    Wang, Huichen
    Zhao, Xuefeng
    Zhang, Jin
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 3396 - +