Government Guarantee Decisions in PPP Wastewater Treatment Expansion Projects

被引:12
|
作者
Wang, Liguang [1 ,2 ]
Shrestha, Asheem [3 ]
Zhang, Wen [2 ]
Wang, Guangbin [1 ]
机构
[1] Tongji Univ, Dept Construct Management & Real Estate, Shanghai 200092, Peoples R China
[2] Brick Publ Consulting Co Ltd, Shenzhen 518054, Peoples R China
[3] Deakin Univ, Sch Architecture & Built Environm, Geelong, Vic 3220, Australia
基金
中国国家自然科学基金;
关键词
public private partnerships; PPPs; wastewater treatment; government guarantee; decision model; PUBLIC-PRIVATE PARTNERSHIPS; CONCESSION PERIOD; INFRASTRUCTURE PROJECTS; REVENUE GUARANTEES; RISK ALLOCATION; REAL OPTIONS; VALUATION;
D O I
10.3390/w12123352
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Public private partnership (PPP) models are often used in delivering wastewater treatment (WWT) projects. When existing PPP projects need expansion due to higher demand for WWT, in many cases, the expansion may involve a new PPP contract involving a new concessionaire. Expansion PPPs have unique challenges as the sharing of responsibilities and risks can become complex. The complexities are further exacerbated when there are government guarantees involved. Structuring inappropriate guarantees can often lead to high costs for the government. This study focused on the choice of government guarantee in PPP expansion projects in the WWT sector by examining two popular guarantee mechanisms: minimum revenue guarantee and exclusive right. A decision model was developed and applied in a real WWT expansion PPP project in China to illustrate the optimal guarantee under varying circumstances related to service demand, expected unit price, and the existing guarantees in the existing PPP project. The contribution of the study lies in the applicability of the model to facilitate better decisions for the government in selecting the optimal guarantee mechanism in PPP expansion projects.
引用
收藏
页数:21
相关论文
共 50 条
  • [1] Evaluating the Bilateral Government Guarantee Value in PPP Highway Projects
    Qin, Min
    Wu, Xiaodong
    PROCEEDINGS OF THE 7TH INTERNATIONAL CONFERENCE ON EDUCATION, MANAGEMENT, INFORMATION AND COMPUTER SCIENCE (ICEMC 2017), 2017, 73 : 807 - 812
  • [2] OPTIMAL EXPANSION TIMING DECISIONS IN MULTI-STAGE PPP PROJECTS INVOLVING DEDICATED ASSET AND GOVERNMENT SUBSIDIES
    Li, Jinghuan
    Li, Yu
    Zhang, Shuhua
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2020, 16 (05) : 2065 - 2086
  • [3] Efficiency Analysis of Government Subsidy and Performance Guarantee Policies in Relation to PPP Infrastructure Projects
    Shi, Lei
    He, Yujia
    Onishi, Masamitsu
    Kobayashi, Kiyoshi
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2018, 2018
  • [4] Efficient risk transfer in PPP wastewater treatment projects
    Shrestha, Asheem
    Chan, Toong-Khuan
    Aibinu, Ajibade A.
    Chen, Chuan
    UTILITIES POLICY, 2017, 48 : 132 - 140
  • [5] Incentive game of investor speculation in PPP highway projects based on the government minimum revenue guarantee
    Wang, Yinglin
    Gao, Huaizhu Oliver
    Liu, Jicai
    TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 2019, 125 : 20 - 34
  • [6] Model for Renegotiation in Infrastructure Projects with Government Guarantee
    Gong, Li
    Tian, Jin
    2012 FIFTH INTERNATIONAL CONFERENCE ON BUSINESS INTELLIGENCE AND FINANCIAL ENGINEERING (BIFE), 2012, : 646 - 648
  • [7] Selecting BOT/PPP Infrastructure Projects for Government Guarantee Portfolio under Conditions of Budget and Risk in the Indonesian Context
    Wibowo, Andreas
    Kochendoerfer, Bernd
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2011, 137 (07) : 512 - 522
  • [8] The demand hierarchy of the government and investors in PPP projects
    Liu, Jiaqi
    Liu, Jicai
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (04) : 1539 - 1555
  • [9] Evaluating Demand Guarantee for PPP Projects by Real-Option Pricing
    Chu, Xiaoling
    Wang, Shouqing
    Feng, Ke
    ICCREM 2017: PREFABRICATED BUILDINGS, INDUSTRIALIZED CONSTRUCTION, AND PUBLIC-PRIVATE PARTNERSHIPS, 2017, : 155 - 162
  • [10] Study on investment return system of PPP wastewater treatment projects based on system dynamics
    Dai T.
    Wang Q.
    Sun X.
    Shi B.
    Dai, Tong (daitong80@126.com), 1600, Inderscience Enterprises Ltd., 29, route de Pre-Bois, Case Postale 856, CH-1215 Geneva 15, CH-1215, Switzerland (20): : 214 - 241