Optimal allocation and transaction of waste load permits for transboundary basin: A Bi-level programming approach based on node-arc

被引:9
|
作者
He, Linhuan [1 ]
Yao, Liming [1 ]
Jiang, Hongqiang [2 ]
机构
[1] Sichuan Univ, Business Sch, Chengdu 610065, Peoples R China
[2] Chinese Acad Environm Planning, State Environm Protect Key Lab Environm Planning, Beijing 100012, Peoples R China
基金
中国国家自然科学基金;
关键词
Waste load permits; Allocation and transaction; Equity and efficiency; Bi-level optimization; Node-arc method; WATER-QUALITY MANAGEMENT; OPTIMIZATION; POLLUTION; SYSTEM; TRADE; UNCERTAINTY;
D O I
10.1016/j.jenvman.2022.114550
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Inadequate water quality exacerbates global water resources scarcity. Hence, water quality of the river basin is increasingly perceived as a global obstacle to sustainable development because of the limited water carrying capacity. Efficient waste load permits (WLPs) allocation plays a critical role in enhancing water quality by controlling the emission cap. Considering transboundary water pollution and transaction among regions, a bi-level objective model is proposed to analyze the WLPs allocation based on the node-arc method. Motivated by alleviating regional development differences, the watershed management committee concentrates on equitable distribution of WLPs to regions. Furthermore, regional authorities focus on how to guarantee the maximum economic development and balance the WLPs emissions from the municipal, industrial, and agricultural sectors. Practicality and efficiency of the constructed model is demonstrated by applying it to Tuojiang River Basin. Through the analysis of the results, three management recommendations are proposed for Tuojiang River: strengthening the prevention of agricultural non-point source pollution, sticking to the cooperation between upstream and downstream regions, and speeding up the construction of sewage environmental tax system. The results illustrate that as the proposed method can control the total amount of sewage, it could provide decision-making references for the amelioration of water environment.
引用
收藏
页数:11
相关论文
共 50 条
  • [1] Bi-Level Programming Approach for the Optimal Allocation of Energy Storage Systems in Distribution Networks
    Shi, Nian
    Luo, Yi
    APPLIED SCIENCES-BASEL, 2017, 7 (04):
  • [2] A bi-level multiobjective optimization model for waste load allocation in rivers
    Zhang, Xuan
    Luo, Jungang
    Xie, Jiancang
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2020, 27 (05) : 5122 - 5137
  • [3] A bi-level multiobjective optimization model for waste load allocation in rivers
    Xuan Zhang
    Jungang Luo
    Jiancang Xie
    Environmental Science and Pollution Research, 2020, 27 : 5122 - 5137
  • [4] Optimal water allocation in Iran: a dynamic bi-level programming model
    Yao, Liming
    Xu, Zhongwen
    Moudi, Mahdi
    Li, Zongmin
    WATER SUPPLY, 2019, 19 (04) : 1120 - 1128
  • [5] An optimal inventory model based on postponement strategy: A bi-level programming approach
    Gui Shouping
    Niu Baozhuang
    Mang Zhiyong
    Li Xinghua
    ICIEA 2007: 2ND IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS, VOLS 1-4, PROCEEDINGS, 2007, : 446 - +
  • [6] A Bi-Level Programming Approach for Optimal Design of EV Charging Station
    Zeng, Bo
    Dong, Houqi
    Wei, Xuan
    Xu, Fuqiang
    Sioshansi, Ramteen
    Zhang, Min
    2019 IEEE INDUSTRY APPLICATIONS SOCIETY ANNUAL MEETING, 2019,
  • [7] A Bi-Level Waste Load Allocation Model Based on Water Function Zoning for Sichuan-Neijiang
    Hou, Shuhua
    Song, Xiaoling
    Yao, Liming
    PROCEEDINGS OF THE NINTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2015, 362 : 209 - 220
  • [8] Optimal CVSR allocation to ensure network health in static load shedding- a Bi-level optimization approach
    Hemmatpour, Mohammad Hasan
    Koochi, Mohammad Hossein Rezaeian
    ELECTRIC POWER SYSTEMS RESEARCH, 2022, 208
  • [9] Manufacturing resource allocation method based on bi-level programming in cloud manufacturing
    Su, Kaikai
    Xu, Wensheng
    Li, Jianyong
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2015, 21 (07): : 1941 - 1952
  • [10] Emergency Resource Location and Allocation Model and Algorithm Based on Bi-level Programming
    Jing, Wang
    Jun, Huang
    Ling, Zhang
    CCDC 2009: 21ST CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, PROCEEDINGS, 2009, : 832 - +