Tool capacity planning for semiconductor fabrication facilities under demand uncertainty

被引:130
|
作者
Swaminathan, JM [1 ]
机构
[1] Univ Calif Berkeley, Walter A Haas Sch Business, Berkeley, CA 94720 USA
关键词
demand scenarios; semiconductor manufacturing; strategic planning; optimization; heuristics;
D O I
10.1016/S0377-2217(98)00389-0
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This research is motivated by issues faced by a large manufacturer of semiconductor devices. Semiconductor manufacturing companies allocate millions of dollars every year for new types of machine tools for their facilities. Typically these are special purpose machine tools which are made to order. The rate of change in products and technology makes it difficult for manufacturers to have a good estimate of future tool requirements. Further, manufacturers experience a long lead time while procuring these tools, In this paper, we model the tool capacity planning problem under uncertainty in demand. The number of tools required in a facility is sufficiently large (nearly hundred or more tools) to make it nearly impossible to obtain efficient exact algorithms. We provide heuristics to find efficient tool procurement plans and test their quality using lower bounds on the formulation. (C) 2000 Elsevier Science B,V. All rights reserved.
引用
收藏
页码:545 / 558
页数:14
相关论文
共 50 条
  • [1] Capacity planning under demand uncertainty for semiconductor manufacturing
    Hood, SJ
    Bermon, S
    Barahona, F
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2003, 16 (02) : 273 - 280
  • [2] Capacity planning for semiconductor wafer fabrication with uncertain demand and capacity
    Geng, Na
    Jiang, Zhibin
    2007 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING, VOLS 1-3, 2007, : 7 - 12
  • [3] DERIVED DEMAND AND CAPACITY PLANNING UNDER UNCERTAINTY
    MODIANO, EM
    OPERATIONS RESEARCH, 1987, 35 (02) : 185 - 197
  • [4] Capacity investment model for airport facilities under demand uncertainty
    Sun, Yanshuo
    Schonfeld, Paul M.
    JOURNAL OF ADVANCED TRANSPORTATION, 2016, 50 (08) : 1896 - 1911
  • [5] Production planning for semiconductor manufacturing under demand and yield uncertainty
    Rashidi, Eghbal
    Bhuiyan, Tanveer Hossain
    Mason, Scott J.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 196
  • [6] Robust Capacity Planning in Network Coding under Demand Uncertainty
    Ghasvari, Hossien
    Raayatpanah, Mohammad Ali
    KSII TRANSACTIONS ON INTERNET AND INFORMATION SYSTEMS, 2015, 9 (08): : 2840 - 2853
  • [7] A general strategic capacity planning model under demand uncertainty
    Hub, WT
    Roundy, RO
    Çakanyildirim, M
    NAVAL RESEARCH LOGISTICS, 2006, 53 (02) : 137 - 150
  • [8] Robust Models for Manufacturing Capacity Planning under Demand Uncertainty
    Karnik, Aditya
    Tallichetty, Chandrashekar S.
    Saroop, Atul
    2009 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING, 2009, : 310 - 315
  • [9] An empirical analysis of capacity and flexibility planning under demand uncertainty
    Hamidian, Nooshin
    Sawhney, Rapinder
    Pradhan, Ninad
    INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2021, 16 (03) : 165 - 174
  • [10] Air Traffic Control Capacity Planning Under Demand and Capacity Provision Uncertainty
    Starita, Stefano
    Strauss, Arne K.
    Fei, Xin
    Jovanovic, Radosav
    Ivanov, Nikola
    Pavlovic, Goran
    Fichert, Frank
    TRANSPORTATION SCIENCE, 2020, 54 (04) : 882 - 896