The Impact of the Sequence of Measures for the Transition to a Resistive-Grounded Neutral in 6-35kV Cable Networks on Investment Profitability

被引:0
|
作者
Kolesnikova, Ksenia V. [1 ]
Gusev, Yuri P. [1 ]
Smotrov, Nickolay N. [1 ]
Alexandr, Kupchinov D. [1 ]
Lkhamdondog, Anna D. [1 ]
机构
[1] Moscow Power Engn Inst, Chair Power Plants, Moscow, Russia
关键词
feasibility study; investments; construction and installation works; commissioning work; payback period; neutral grounding mode;
D O I
10.1109/eiconrus.2019.8656824
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The paper considers the feasibility of transferring an existing 6-10 kV urban distribution cable network with Resonant earthed system to a low resistance neutral grounding system. A separate section of a 10 kV network with 50 distribution points and about 400 transformer substations was chosen as a pilot site for the project. For the selected network segment, an analysis and quantitative assessment of the components and an investment feasibility of the study to show potential economic effect of the project was undertaken. The results indicate that the project to transfer the existing city cable network from a resonant earthed system neutral grounding to low-resistance neutral grounding is economically feasible and its implementation will ensure the network infrastructure is more economically efficient, which will in turn result in increased reliability for electricity consumer.
引用
收藏
页码:992 / 995
页数:4
相关论文
共 1 条
  • [1] On resistive grounding of the neutral in networks from 6 to 35 kV
    Kadomskaja, KP
    Wishtibeev, AV
    KORUS '99: THIRD RUSSIAN-KOREAN INTERNATIONAL SYMPOSIUM ON SCIENCE AND TECHNOLOGY, VOLS 1 AND 2, 1999, : 738 - 740